My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
09-13-12 Packet
>
6C (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:09:53 PM
Creation date
9/10/2012 1:25:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. A n Kolata <br />August 14, 2012 <br />Page 6 of 9 <br />I <br />In sup rt of the activities described additional communications (telephone, email, facsimile, and <br />in -per Ion, either on -site or off -site) between Weaver Boos, City, IDEM personnel, and <br />will occur to effectively manage the project. <br />Task 4 — Prepare Corrective Action Plan (if necessary) <br />If soil and/or groundwater contaminant concentrations exceed RISC Residential Default Closure <br />Levels then corrective action will be necessary. Once the nature and extent of contamination has <br />been d fined Weaver Boos will prepare a Corrective Action Plan (CAP). A specific scope of <br />work and cost estimate for the preparation and implementation of the CAP cannot be provided <br />until the site characterization has been completed. The CAP will be prepared in accordance with <br />IDEM rules. The CAP may be prepared separately from the FSI Report and may or may not be <br />submitted to IDEM concurrently depending upon the magnitude of the subsurface impacts. <br />Based on our finding from the ISC and the IDEM correspondence, dated June 27, 2011, Weaver <br />Boos anticipates that quarterly sampling of the groundwater may be all that is required (no active <br />remedi tion) for the CAP. If this continues to be the case after the FSI has been completed then <br />no separate CAP may be necessary. Typically, IDEM will require a minimum of two years of <br />quarter y sampling to demonstrate that groundwater contaminant levels are below closure <br />standards prior to proceeding with site closure. However, IDEM, may be amenable to a more <br />expeditpd closure of the site in light of the proposed redevelopment. <br />Task 3 � Implement Corrective Action Plan (f necessary) <br />Weaver{ Boos can implement corrective action if found necessary by IDEM based on Site <br />conditi ns. <br />Task 4 � Request Closure/1VFA <br />Once I EM approves the CAP (review will normally occur within 60 days of submittal), Weaver <br />Boos will implement the CAP. Periodic progress reports may be required to be prepared and <br />submitted to IDEM. Once the CAP has been completed then a closure report will be submitted <br />requesting a No Further Action Letter (NFA) letter for the release. <br />
The URL can be used to link to this page
Your browser does not support the video tag.