My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
09-13-12 Packet
>
6C (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:09:53 PM
Creation date
9/10/2012 1:25:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. Aim Kolata <br />Augus 14, 2012 <br />Page 5 of 9 <br />tasks Nvill be discussed in advance with the City. Sampling and laboratory analyses will be <br />performed in general accordance with approved techniques and methods as outlined in USEPA <br />SW-846, Test Methods_for Evaluating Solid Waste, Third Edition, and other published sources. <br />Laboratory-certified sampling containers for the samples will be filled (and preserved) in <br />accord ce with laboratory specifications. The samples will be placed into a cooler, packaged <br />with is to maintain a shipment temperature of approximately 4 degrees Centigrade, documented <br />with a chain -of- custody form, sealed, and shipped overnight or hand - delivered to the analytical <br />laborat rv. <br />1 -B /Prepare Further Site Investigation <br />Upon conclusion of the field activities related to the Final Site Investigation, a Report will be <br />completed and submitted (upon approval by the City) to IDEM for review and approval (typically <br />within 0 days). The report will contain the information outlined in 329 IAC 9- 5 -5.6. If nature <br />and ext nt of contamination is defined when this task is completed then Weaver Boos will either <br />proceec to Task 2 — Prepare Corrective Action Plan if corrective action is required or Task 4 — <br />Reque t Closure/NFA if the contaminant concentrations do not exceed RISC Residential <br />Default Cleanup Levels. If corrective action is necessary, then the completion of Task 3 — <br />Implement Corrective Action will be necessary. <br />Note, if the plume of contamination is widespread and migrated off -site then additional <br />investigation activities, as part of the FSI, will be required prior to the completion of Task 2. <br />Based on the results of the earlier ISC, this is not anticipated. These activities are beyond the <br />scope of this proposal but will be forwarded to the City, in necessary, upon completion of the <br />Task 1- . <br />Per the IDEM correspondence dated, June 27, 2011, Weaver Boos will also correct any <br />deficiencies in the UST Closure Report submitted to the IDEM UST Section in 2007 by others. <br />The information may not be included in the FSI Report and will be submitted to the IDEM -UST <br />Section fter City review and approval. <br />
The URL can be used to link to this page
Your browser does not support the video tag.