My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (3)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
09-13-12 Packet
>
6C (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2013 7:09:53 PM
Creation date
9/10/2012 1:25:49 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Ms. A n Kolata <br />Augusl 14, 2012 <br />Page 7 of 9 <br />If results of the FSI completed as part of Task I indicate that the soil and groundwater <br />contan inant concentration do not exceed residential default closure standard then a NFA letter <br />will be requested as part of the FSI and the overall project will be deemed complete unless IDEM <br />indicat s otherwise. IDEM may want additional quarterly monitoring to occur. Tasks 2 -4 will <br />not be ecessarv. <br />Task 5 — Project Management <br />In support of the activities described additional communications (telephone, email, facsimile, and <br />in-person, either on -site or off -site) between Weaver Boos, City, IDEM personnel, and <br />subcon ractors will occur to effectively manage the project. A cost estimate for the completion <br />of this task follows. <br />SCHEDULE <br />Task 1 can be completed within 60 days of authorization. Due to the several factors including <br />the proposed redevelopment of the site, Weaver Boos will expedite the investigation where <br />possible include immediately scheduling the fieldwork upon authorization. An estimate schedule <br />to complete the remainder of the tasks outlined (if deemed necessary) is entirely dependent upon <br />the ext( <br />Weaves <br />accord <br />comple <br />known, <br />been cc <br />For inf( <br />Tasks 2 <br />high pri <br />confine <br />ground) <br />then a I <br />complel <br />of subsurface impacts identified. <br />COST ESTIMATE <br />Boos proposes to perform the FSI as outlined in Task I on a time and material basis in <br />ice with our fee schedule included with this proposal. We estimate the work can be <br />;d for $ 26,952.00 as summarized below. Since actual site conditions are not presently <br />i specific cost estimate to complete the remaining tasks will be provided once Task I has <br />npleted. <br />.mation purposes, however, Weaver Boos has provided a general cost estimate range for <br />5 assuming that no emergency response is required to address the release, the site is not a <br />)rity (to date the site has been classified as low priority), and the contamination is largely <br />to the site. Also, if the FSI completed as part of Task 1 indicates that the soil and <br />'ater contaminant concentration do not exceed RISC Residential Default Closure Levels <br />TA letter will be requested as part of the FSI and the overall project will be deemed <br />unless IDEM indicates otherwise. Tasks 2 -5 will not be necessary. <br />
The URL can be used to link to this page
Your browser does not support the video tag.