Laserfiche WebLink
5. <br />P <br />On..mo- <br />ion:- by.Rev. Williams, seconded: by Mrs Wilhelm, <br />_ <br />the f <br />ve Dpti.on Agreements.' as 1 i s°ted. abbve ,.: were <br />approved. <br />_. <br />c <br />Engineering Agreement,,,-,Addendum Noy 3: Tfie. <br />_ ;ENGINEERING AGREEMENT, <br />Engin <br />ering Agreement dated August 1 j . T6 , .amended <br />ADDENDUM NO. 3, <br />by Ad <br />ienda dated May 27, 1968 and September ,1:9.,:•1968, <br />LASALLE. PARK URBAN <br />by ani <br />between the City of-South Bend, Dep"artment.,of <br />:: RENEWAL PROJECT, <br />Redev <br />lopment, and Chas. W. Cole &. S:.on.;r, In.corpbrated; ?- <br />, <br />is am <br />nded to increase the maximum fee for the Design <br />Phase <br />Services and Construction Phase Services as a <br />resul <br />of the increased Project Construction Cost, <br />- <br />inclu <br />ing the addition of the Alley Improvements. <br />Thee <br />gineering contract is based on- the�.tota-l- cost. i.: <br />of si <br />1perates <br />e,imp.rovement work. Presil,dent Wiggins.state:d <br />this <br />on a sliding scale. Thereq:uest,to <br />= =• <br />the C <br />mmission was the authorization for the Preti <br />dent <br />o sign the document upon review and approval <br />by Le <br />al Counsel, Mr. Bruce C:...Hammerschmidt,::The <br />motioi <br />was made by-Mr. Helmen, seconded.-by Mr. Wit -. <br />helm, <br />pending Legal Counsel's approval, Addendumf'No: _ <br />3 is <br />6,o be authorized for. the° President and ::Secretary:;:: <br />. <br />to ex <br />cute. The "ayes" were:.unanimous. by. -all Com- <br />missioners. <br />d <br />Sale of Land in the LaSalle,rPark'.Urban!Re -. <br />LAND SALE, LASALLE <br />newal <br />Pro ect R-57: Authorization was requested <br />PARK =URBAN - RENEWAL <br />to open <br />bids for the sale. of additional-land in-the, <br />.,,,PROJECT, R -57' <br />LaSal <br />a Park Urban Renewal - Project.. Mr. Bellinger.,- <br />stated <br />that the initial- sale was quite successful:': <br />The date <br />for the bid opening is requested for May 7, <br />- <br />1969, <br />at 2:00 P.M., E.D.T., in the office of the <br />Depar. <br />ent of Redevelopment, for 30 selected parcels <br />of re <br />identiai land, within the,La5alle Park Urban:.: <br />-, <br />Renew <br />1 Project Area. The soil'conditions: will -re- <br />quire <br />basement and /or crawl-.space construction. - <br />Presi <br />ent Wiggins asked- i f the lots _ have - been: checked <br />for s <br />i l condtti ons and Mr. Bel linger.. stated.1heyv <br />have <br />all been checked and found to be buildabld,; and <br />that <br />asements, crawl spaces; or both, may be re-., <br />quire <br />for construction parposet. On mdtion by Mr. <br />- <br />Chenn <br />y, seconded by Mr..,Wilhelm, bid opening date <br />of Ma <br />7, 1969, at 2:00 P.M.:ED:T, was approved <br />forte <br />30 parcels of residential land in this Pro- -. <br />jest. <br />The "ayes" were unanimousfor approval.. <br />-5- <br />