My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RM 11-07-68
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1960-1969
>
1968
>
RM 11-07-68
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 2:04:10 PM
Creation date
9/7/2012 3:40:34 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f. <br />Woodruf: <br />Pavemen <br />Project <br />order w+ <br />$21,891 <br />Order Ni <br />of $21,� <br />Helmen. <br />9- <br />Revised Change Order No. 6, Contract "A", <br />nd Sons,-Inc., for Additional New Sidewal <br />and Tree Removal, LaSalle Park Urban Renewal <br />R -57: The total cost of the original change <br />s $22,310.00, and this has now been reduced to <br />00 - -a reduction of $419.00. Revised Change <br />. 6, Contract "A ", was approved, in the amount <br />91.00, on motion by Mr. Kompar, seconded by Mr. <br />sociates <br />Contract with Clyde E. <br />to perform necessary tr <br />er- <br />imz des n services Central Downtown Urban Renewal Pro- <br />ject R-66: The proposed work requests that the con- <br />sultant review the - proposed thoroughfare system to <br />determine actual street design standards for the purpose <br />of geometric design. The City Engineer and Area Plan <br />Commiss on agree-this evaluation is needed prior to <br />actual hysical designing of the streets in the down- <br />town aria. - - <br />REVISED CHANGE <br />ORDER NO. 6, <br />CONTRACT "A", <br />LASALLE PARK URBAN <br />RENEWAL PROJECT, <br />R -57 <br />CONTRACT, <br />CENTRAL DOWNTOWN <br />URBAN RENEWAL <br />PROJECT, R -66 <br />Commissioner Helmen raised the question whether this <br />work would be a duplication and if the City would have <br />to do it. The Commission was apprised this work is not <br />a duplication. The Commission has designated Clyde E. <br />William & Associates, Inc., as the consultant engineer <br />to the Commission for the actual construction drawings <br />and are an appropriate group to do this design study. <br />The contract cost will be based on actual time, but not <br />to exceed $5,000.00-. <br />The question was raised as to what will happen if the <br />Downtowk project does not go through. President Wig- <br />gins stated it is his opinion the Commission would <br />pay for this work out of other funds, and this is all <br />subject to Federal approval. He stated the Commission <br />does not believe this project will be stopped because <br />of this suit and we are going to proceed as long as <br />we can as if the suit had not been filed. However, <br />if it is not settled rather quickly, it can have a <br />deterreilt effect by slowing the project down. He con- <br />cluded that there is a risk involved at this time. On <br />motion by Mr. Kompar, seconded by Mr. Helmen, this con- <br />tract was approved, with the maximum amount being $5,000.00. <br />h. <br />cover P <br />Renewal <br />75 reha <br />Two Rehabilitation Grants: These grants <br />ircels #30 -18 and #31 -18, in the LaSalle Urban <br />Project, R -57. This brings a total of about <br />)ilitation grants approved to date. 36 other <br />- 7 - <br />REHABILITATION <br />GRANTS APPROVED, <br />LASALLE URBAN <br />RENEWAL PROJECT, <br />R -57 <br />>> <br />
The URL can be used to link to this page
Your browser does not support the video tag.