My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10082019 Board of Public Works Meeting
sbend
>
Public
>
Public Works
>
Minutes
>
2019
>
10082019 Board of Public Works Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 1:18:56 PM
Creation date
10/22/2019 12:18:33 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
10/8/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING OCTOBER 8, 2019 293 <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />MICHIANA CONTRACTING, INC. <br />7843 Lilac Road, PO Box 929 <br />Plymouth, IN 46563 <br />Bid was signed by: Scott Kirkpatrick <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />Base Bid Lump Sum <br />$375,000 <br />Add Alternate #1 Lump Sum <br />$29,000 <br />Add Alternate #2 Lump Sum <br />$16,000 <br />Add Alternate #3 Lump Sum <br />$57,420.75 <br />Base Bid plus Alternates <br />$375,000 <br />BROWN & BROWN GENERAL CONTRACTORS, INC. <br />124 S. Elkhart St., PO Box 487 <br />Wakarusa, IN 46573 <br />Bid was signed by: Eric Brown <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />Base Bid Lump Sum <br />$296,870.00 <br />Add Alternate #1 Lump Sum <br />No Change <br />Add Alternate #2 Lump Sum <br />No Bid <br />Add Alternate #3 Lump Sum <br />$88,054.00 <br />Base Bid plus Alternates <br />$384,924.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Miller and carried, the above bids were <br />referred to Venues, Parks, and Arts and Engineering for review and recommendation. <br />OPENING OF BIDS — EDISON FILTRATION PLANT ROOF REPLACEMENT — PROJECT <br />NO. 119-014 (WASTEWATER CAPTIAL BUILDING IMPROVEMENTS) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bid was opened and publicly read: <br />BROWN & BROWN GENERAL CONTRACTORS, INC. <br />124 S. Elkhart St., PO Box 487 <br />Wakarusa, IN 46573 <br />Bid was signed by: Eric Brown <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Five percent (5%) Bid Bond was submitted <br />Base Bid Total <br />$432,417.00 <br />Alternate #1 Total <br />$33,283 <br />Base Bid plus Alternate <br />$465,700.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Miller and carried, the above bid was <br />referred to Engineering for review and recommendation. <br />OPENING OF BIDS — CENTURY CENTER ELEVATOR RENOVATION — PROJECT NO. <br />118-104D (HOTEL/MOTEL TAX) <br />1 <br />I <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.