My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Proposals - Road Reconstruction for Olive St in LaPorte District - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:02:13 PM
Creation date
9/25/2019 3:15:10 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CITY OF SOUTH BEND OLIVE STREET ROAD RECONSTRUCTION <br />PROJECT UNDERSTANDING AND APPROACH <br />e �Y e,� ria Y f N a r r< <br />+: y dh'R�,ar� ,N, ,,�V �pI;Cftdb �;m'u��G',-"a.� ar"'�`�:: Y�'f <br />This is a heavy haul route within the City of South Bend and will be reconstructed with concrete pavement. The road- <br />way will be constructed to include one lane of traffic in each direction with a two-way center turn lane. New storm <br />sewer will be installed as well. <br />As with most construction projects, utility coordination will play a major role in the success of the overall project <br />schedule. We are committed to leading the coordination effort so that utilities are relocated quickly and efficiently <br />to minimize conflicts. Our dedicated and local project manager, Scott Randle personally knows individuals from <br />most area utility companies, having built relationships while working on previous projects. These relationships, as <br />well as those with potential contractors and subcontractors, are key to leading coordination efforts across all utilities <br />involved. <br />Maintenance of traffic will be a very important aspect of this project. We will work diligently with the contractor and <br />subcontractors to implement the most thorough maintenance -of -traffic plan possible. We will also maintain a close <br />watch on traffic patterns during construction to ensure quick reaction to any issues with the overall traffic flow, as well <br />as working with the contractor to develop specific plan changes to fit the unique characteristics of the contractor's <br />planned means and methods. Any necessary changes will be implemented quickly and will adhere to all applicable <br />traffic control guidelines. <br />Contract R-37495 is currently scheduled for an INDOT letting on November 10, 2020. It is anticipated the construc- <br />tion duration will last through the 2021 construction season. American Structurepoint has visited the project site and <br />reviewed details of the project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.