CITY OF SOUTH BEND OLIVE STREET ROAD RECONSTRUCTION
<br />Education
<br />Bachelor of Science, Civil Engineering,
<br />1995, Purdue University
<br />License and Certifications
<br />Professional Engineer — Indiana & Ohio
<br />INDOT Project Engineer/Project Supervisor
<br />Workshop
<br />INDOT Qualified Technician Tests
<br />INDOT SiteManager Certification
<br />As field manager, John's duties in-
<br />clude overseeing multiple road,
<br />bridge, and sewer projects; assisting
<br />RPRs with project administration and
<br />field operations observed by inspec-
<br />tors; and recording work and material
<br />data. In addition, he manages project
<br />funding and change orders, reports
<br />project progress to owners, and trou-
<br />bleshoots construction and design
<br />issues. John has worked as a con-
<br />struction supervisor and inspector for
<br />state, local, and public agencies on
<br />federal -aid road and sewer construc-
<br />tion projects.
<br />aI,40jI, 11� 111 1411 III„g�,Il
<br />• Cleveland Road Reconstruction and
<br />Bridge Rehabilitation, South Bend,
<br />Indiana 14 40111
<br />• Reconstruction of Sixth Street Gordon
<br />Road to US 24, Monticello, Indiana
<br />I', 3,1((24
<br />• Coolspring Avenue Reconstruction,
<br />Michigan City, Indiana R 29931
<br />• 45th Avenue Reconstruction (Phase 1),
<br />Lake County, Indiana 4t-:fa(48911
<br />• Edison Road Added Center Turn Lane
<br />from Ironwood Road to Gordon Drive,
<br />South Bend, Indiana Q 33,792
<br />• Lasalle School Area Storm Sewer
<br />Separation, South Bend, Indiana
<br />• Ironwood & Auten Road, South Bend,
<br />Indiana 1(-33234
<br />• South Bend Safe Route to School,
<br />South Bend, Indiana P( 119', 14
<br />Education
<br />Bachelor of Arts, Communication, 2010,
<br />Purdue University
<br />License and Certifications
<br />INDOT Qualified Technician Tests
<br />INDOT SiteManager Certification
<br />ACI Concrete Field Testing Technician
<br />Grade I
<br />INDOT Certified Technician (all categories)
<br />IWEA Water & Sewer Construction
<br />Observation
<br />OSHA 10 Hour Training -Construction
<br />Josh is responsible for documenting
<br />work, recording material data, track-
<br />ing quantities, material testing, and
<br />assisting the project manager with
<br />daily project requirements. He has
<br />worked as an inspector for state,
<br />local, and public agencies on feder-
<br />al -aid and locally funded bridge, road,
<br />and utility infrastructure projects
<br />since 2008.
<br />4"' 111"4 0 411 C11 i X 111h�„ 111=1 R i E 1p,,I 411 i��
<br />• Cleveland Road Reconstruction and
<br />Bridge Rehabilitation, South Bend,
<br />Indiana R^.�i(avl
<br />Main Street Reconstruction, East
<br />Chicago, Indiana
<br />Sixth Street Reconstruction Phase
<br />V from Rickey Road to CR 225,
<br />Monticello, Indiana R 33077
<br />• Towne Road Reconstruction, Phase 11,
<br />Carmel, Indiana
<br />• Keystone Parkway Reconstruction,
<br />Carmel, Indiana
<br />• Chicago Street Reconstruction,
<br />Hammond, Indiana
<br />• SR 49 at CR 400, Valparaiso, Indiana
<br />114 0 7001
<br />• Prairie Street Grade Separation,
<br />Elkhart, Indiana 1 -32110
<br />Education
<br />Bachelor of Science, Civil Engineering -
<br />Transportation, 2017, Purdue University
<br />Northwest
<br />License and Certifications
<br />INDOT Certified Technician (all categories)
<br />INDOT Qualified Technician Tests
<br />IWEA Water & Sewer Construction
<br />Observation
<br />As a construction inspector, Krista's
<br />responsibilities include documenting
<br />work, recording material data, track-
<br />ing quantities, material testing, and
<br />assisting the project manager with
<br />daily project requirements. Krista has
<br />specialized experience with contract
<br />budgets, PCCP bike paths, QC/QA
<br />HMA and QC/QA PCCP roadways,
<br />construction through wetlands, and
<br />mitigation. Her technical capabilities
<br />include SiteManager, concrete and
<br />compaction testing equipment, and
<br />INDOT standards and specifications.
<br />1J11�� 0JtoC 1 E,X, P1E 11 El N]C
<br />• Cleveland Road Reconstruction and
<br />Bridge Rehabilitation, South Bend,
<br />Indiana 1( 40,171
<br />• Chicago Street Reconstruction - Phase
<br />3, Hammond, Indiana R/ 3/V740
<br />• Chicago Street Advanced Clearing -
<br />Phase 1, Hammond, Indiana 14 3,897Y
<br />Industrial Highway Reconstruction,
<br />Gary, Indiana 1�
<br />• 101st Avenue Bridge Replacement
<br />over 1-65, Merrillville, Indiana l a 40822
<br />• Westchester - Liberty Trail, Phase 2,
<br />Chesterton, Indiana o4
<br />• Central Avenue Reconstruction,
<br />Portage, Indiana R Q574
<br />
|