Laserfiche WebLink
CITY OF SOUTH BEND OLIVE STREET ROAD RECONSTRUCTION <br />Education <br />Bachelor of Science, Civil Engineering, <br />1995, Purdue University <br />License and Certifications <br />Professional Engineer — Indiana & Ohio <br />INDOT Project Engineer/Project Supervisor <br />Workshop <br />INDOT Qualified Technician Tests <br />INDOT SiteManager Certification <br />As field manager, John's duties in- <br />clude overseeing multiple road, <br />bridge, and sewer projects; assisting <br />RPRs with project administration and <br />field operations observed by inspec- <br />tors; and recording work and material <br />data. In addition, he manages project <br />funding and change orders, reports <br />project progress to owners, and trou- <br />bleshoots construction and design <br />issues. John has worked as a con- <br />struction supervisor and inspector for <br />state, local, and public agencies on <br />federal -aid road and sewer construc- <br />tion projects. <br />aI,40jI, 11� 111 1411 III„g�,Il <br />• Cleveland Road Reconstruction and <br />Bridge Rehabilitation, South Bend, <br />Indiana 14 40111 <br />• Reconstruction of Sixth Street Gordon <br />Road to US 24, Monticello, Indiana <br />I', 3,1((24 <br />• Coolspring Avenue Reconstruction, <br />Michigan City, Indiana R 29931 <br />• 45th Avenue Reconstruction (Phase 1), <br />Lake County, Indiana 4t-:fa(48911 <br />• Edison Road Added Center Turn Lane <br />from Ironwood Road to Gordon Drive, <br />South Bend, Indiana Q 33,792 <br />• Lasalle School Area Storm Sewer <br />Separation, South Bend, Indiana <br />• Ironwood & Auten Road, South Bend, <br />Indiana 1(-33234 <br />• South Bend Safe Route to School, <br />South Bend, Indiana P( 119', 14 <br />Education <br />Bachelor of Arts, Communication, 2010, <br />Purdue University <br />License and Certifications <br />INDOT Qualified Technician Tests <br />INDOT SiteManager Certification <br />ACI Concrete Field Testing Technician <br />Grade I <br />INDOT Certified Technician (all categories) <br />IWEA Water & Sewer Construction <br />Observation <br />OSHA 10 Hour Training -Construction <br />Josh is responsible for documenting <br />work, recording material data, track- <br />ing quantities, material testing, and <br />assisting the project manager with <br />daily project requirements. He has <br />worked as an inspector for state, <br />local, and public agencies on feder- <br />al -aid and locally funded bridge, road, <br />and utility infrastructure projects <br />since 2008. <br />4"' 111"4 0 411 C11 i X 111h�„ 111=1 R i E 1p,,I 411 i�� <br />• Cleveland Road Reconstruction and <br />Bridge Rehabilitation, South Bend, <br />Indiana R^.�i(avl <br />Main Street Reconstruction, East <br />Chicago, Indiana <br />Sixth Street Reconstruction Phase <br />V from Rickey Road to CR 225, <br />Monticello, Indiana R 33077 <br />• Towne Road Reconstruction, Phase 11, <br />Carmel, Indiana <br />• Keystone Parkway Reconstruction, <br />Carmel, Indiana <br />• Chicago Street Reconstruction, <br />Hammond, Indiana <br />• SR 49 at CR 400, Valparaiso, Indiana <br />114 0 7001 <br />• Prairie Street Grade Separation, <br />Elkhart, Indiana 1 -32110 <br />Education <br />Bachelor of Science, Civil Engineering - <br />Transportation, 2017, Purdue University <br />Northwest <br />License and Certifications <br />INDOT Certified Technician (all categories) <br />INDOT Qualified Technician Tests <br />IWEA Water & Sewer Construction <br />Observation <br />As a construction inspector, Krista's <br />responsibilities include documenting <br />work, recording material data, track- <br />ing quantities, material testing, and <br />assisting the project manager with <br />daily project requirements. Krista has <br />specialized experience with contract <br />budgets, PCCP bike paths, QC/QA <br />HMA and QC/QA PCCP roadways, <br />construction through wetlands, and <br />mitigation. Her technical capabilities <br />include SiteManager, concrete and <br />compaction testing equipment, and <br />INDOT standards and specifications. <br />1J11�� 0JtoC 1 E,X, P1E 11 El N]C <br />• Cleveland Road Reconstruction and <br />Bridge Rehabilitation, South Bend, <br />Indiana 1( 40,171 <br />• Chicago Street Reconstruction - Phase <br />3, Hammond, Indiana R/ 3/V740 <br />• Chicago Street Advanced Clearing - <br />Phase 1, Hammond, Indiana 14 3,897Y <br />Industrial Highway Reconstruction, <br />Gary, Indiana 1� <br />• 101st Avenue Bridge Replacement <br />over 1-65, Merrillville, Indiana l a 40822 <br />• Westchester - Liberty Trail, Phase 2, <br />Chesterton, Indiana o4 <br />• Central Avenue Reconstruction, <br />Portage, Indiana R Q574 <br />