Laserfiche WebLink
Section 18 - Creter Cranes <br />Concrete conveyors mounted on rough terrain cranes (creter cranes) shall receive one-half (1/2) hour <br />preparation time. When the creter crane is equipped with a conveyor system capable of extending seventy (70) feet or <br />more, the engineer shall receive an additional fifty cents ($0.50) per hour wage increase over and above the regular rate <br />of pay for operating the creter crane. <br />Section 19 - Truck Mounted Concrete Pumps <br />Truck mounted concrete pump operations shall require an operator. When such machine is equipped with a <br />boom, which is capable of extending ninety (90) feet or more, the Engineer shall receive an additional twenty-five cents <br />($0.25) per hour wage increase over and above the regular rate of pay for operating the concrete pumps. <br />Section 20 - Helicopters <br />The use of helicopters (external loads) under the terms of this Agreement shall require a three (3) man crew, <br />one (1) pilot and two (2) controllers. The pilot and controllers must have direct radio communications during the <br />actual hoisting operation. The crew shall receive the hourly wage rate set forth in this Agreement for crane operators, <br />and in addition, the pilot shall receive Long Boom Pay. <br />Section 21- Bobcats <br />Bobcats or machines of a like nature that are designed to use bucket attachments of various sizes and the <br />manufacturer rates such machine capable of handling buckets of three -fourth (3/4) cubic yard or under, such machine <br />shall be in Class IV (oiler) wage category. <br />Bobcats or machines of like nature that are designed to use bucket attachments of various sizes and the <br />manufacturer rates such machine capable of handling buckets of over three -fourth (3/4) cubic yard, such machine shall <br />be in Class II wage category. Bobcats or machines of a like nature doing commercial or residential type work shall be <br />classified Class V. Bobcat with attachments other than loader bucket to be classified as per attachment. <br />Section 22 - Forklifts <br />(A) Forklifts capable of hoisting and mechanically moving forks horizontally - Employees operating the <br />above mentioned machine servicing less than six (6) bricklayers shall receive Class II rate of pay. <br />(B) Forklifts with fixed or tilt masts - Employees operating forklift with fixed or tilt masts servicing less <br />than six (6) bricklayers shall receive Class III rate of pay. <br />Section 23 - Self -Erecting Tower Crane <br />The use of self -erecting, self-contained, (excluding counter -weights), cranes under seven (7) tons without the <br />potential ability to lift more than seven (7) tons on residential single-family construction projects, and multi -family <br />residential housing construction projects not exceeding thirty total units or one hundred twenty feet (120') in height. <br />The parties further understand that no oiler is required, but that provisions of Article IV, Section 12, "PREPARING <br />EQUIPMENT", will apply to the operation of such equipment. If used on anything not mentioned above or on <br />commercial projects, all terms and conditions of the building agreement shall apply, except no oiler is required, but <br />preparing equipment shall apply, as long as the project does not exceed thirty total units or one hundred twenty feet <br />(120') in height. <br />Section 24 - Craft Foreman and/or Master Mechanic <br />Where any Employer employs ten (10) or more employees in the Bargaining Unit on any one project, the <br />Employer by mutual agreement with the Union, shall employ a Craft Foreman and shall pay such individual the wages <br />provided for in this Agreement. It is understood that the craft foreman will perform various duties until ten (10) <br />employees of the Bargaining Unit are employed. <br />After ten (10) men are employed, the Craft Foreman shall not operate equipment or do any repair work, except <br />in emergencies, or in the temporary absence of the regular operator. The Craft Foreman shall be the lead man of the ten <br />(10) or more employees in the Bargaining Unit. Such individual, however, shall neither have the authority to nor shall <br />he exercise any of the functions customarily exercised by supervisors within the meaning of the National Labor <br />14 <br />MICHIANA BUILDERS ASSOCIATION INC <br />FINAL <br />DFAGAN.JGARDNER.NCLINE <br />MAY 19, 2017 mlc <br />