My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Larson Danielson Construction - 2
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Century Center Parking Lot Entry Gate Improvements Proj No 118-035A - Larson Danielson Construction - 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 8:49:00 AM
Creation date
9/25/2019 3:06:29 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
9/24/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
straight time rates. If shift work is required the rules of shift work time and pay will <br />apply. Saturdays and Sundays overtime rates still apply. The work week shall be Monday <br />thru Thursday also normal work hours rule will apply. <br />ARTICLE VII <br />WORKING CONDITIONS <br />Sec#:ion 1. Foremanship: When a contracting firm consists of two (2) or <br />more Cement Masons, only one (1) Cement Mason of the firm shall be allowed to work <br />with the tools. A contractor who is an experienced Cement Mason may act as Foreman if <br />he remains on the job and acts in the capacity of Foreman. <br />Section 2. Any and all Contractors having one or more jobs going at the same <br />time will have a Cement Mason Foreman on each job when Cement Mason or Masons <br />are working on said job. No Cement Mason shall act as Foreman on more than one job at <br />the same time. Second Foreman shall have no increase in pay until he has one or more <br />men working with him. <br />Section 3. The Foreman shall be an Employee within the bargaining unit as <br />defined by the National Labor Relations Act, as amended. <br />Section 4. The Superintendent or Contractor may inform the Foreman as to <br />what work is required. The Foreman shall take order from the Contractor and/or <br />Superintendent only, said Foreman with five (5) or more men shall not be required to use <br />the tools. <br />Section. 5. No Cement Mason or Cement Mason Foreman shall be required to <br />transport troweling machines or other kind of company equipment. <br />Section 6. No Contractor shall use any chloride or other chemical additive, <br />which makes the concrete set faster unless he notifies his Foreman in advance. <br />Section 7. All work shall be done in a good workmanlike manner and the <br />Employer shall allow a reasonable amount of time to have the same so done. <br />Section 8. No outside floor, sidewalk, or driveway pour shall start in weather <br />conditions of rain snow, sleet or hail, except by mutual agreement. <br />Section 9. Any concrete that is poured to an established grade such as <br />footings or walls shall be screeded or floated off by the Cement Mason. <br />Section 1.0.. Any ground or dock concrete pour that is sixteen (16') feet or over <br />in width shall have one (1) or more hard screeds set in it before pouring is started. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.