My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/23/2005 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2005
>
05/23/2005 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:05:40 PM
Creation date
8/29/2012 2:39:37 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/23/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t 7 GULAR MEETING MAY 23, 2005 <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $1 142,718.06 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Gilot, and carried, the above bids were <br />referred to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS — EAST WASHINGTON STREETSCAPE — NILES TO HILL — PROJECT <br />NO. 104-046 (SBCDA BOND) <br />This was the date set for receiving and opening of sealed bids for the above referred to project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County <br />News, which were found to be sufficient. The following bids were opened and publicly read: <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />25200 State Road 23 <br />South Bend, Indiana 46613 <br />Bid was signed by Mr. Christopher L. Weinkauf <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $1,079,921.00 <br />Alternate 1: $ 8,699.00 <br />Alternate 2: $23,195.00 <br />Alternate 3: $ 5,440.00 <br />SELGE CONSTRUCTION COMPANY, INC. <br />2833 South I It' Street <br />Niles, Michigan 49120 <br />Bid was signed by Mr. John Szuba <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $1,148,549.00 <br />Alternate 1: $ 8,865.00 <br />Alternate 2: $21,957.00 <br />Alternate 3: $14,500.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Gilot, and carried, the above bids were <br />referred to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS — ONE (1) MORE OR LESS PNEUMATIC TIRE ROLLER — STREET <br />DEPARTMENT (2005 VEHICLE CAPITAL BUDGET) <br />This was the date set for receiving and opening of sealed bids for the above referred to <br />equipment. The Clerk tendered proofs of publication of Notice in the South Bend Tribune and <br />the Tri-County News, which were found to be sufficient. The following bids were opened and <br />publicly read: <br />MACDONALD MACHINERY COMPANY, INC. <br />3953 Ralph Jones Drive <br />South Bend, Indiana 46628 <br />Bid was signed by: Mr. Don Finn <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Ten percent (10%) Bid Bond was submitted <br />BID: Base Bid $50,500.00 <br />Trade In: $ 2,800.00 <br />Total Cost Less Trade -In: $47,700.00 <br />SOUTHEASTERN EOUIPMENT COMPANY, INC. <br />3333 West Coliseum Boulevard <br />Fort Wayne, Indiana 46808 <br />Bid was signed by: Mr. Jason Kruse <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />
The URL can be used to link to this page
Your browser does not support the video tag.