My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Performance Services Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Performance Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:22:03 PM
Creation date
8/28/2019 11:13:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Performance <br />Services <br />EXPERIENCE <br />mcooprider@performanceservices.com <br />www.performanceservices.com <br />Vili IlllhCoo llld Illu lilli ar, NABCEI�l <br />SOLAR ENGINEER <br />Michael joined Performance Services full-time in 2016 after interning with the <br />company for two years while pursuing his masters degree in electrical engineering <br />from I1UPU1. Michael's background in renewable and sustainable energy coupled <br />with his electrical engineering degree makes him a perfect fit for the Performance <br />Services solar energy team. Michael is passionate about solar PV and wants to bring <br />solar energy offerings to customers to save money and create a sustainable future. <br />"���ayette Cot.miitty Sclteolll Corporafloin, ll'tp 2019 <br />Total Contract: $2,487,520 (Solar PV) <br />• 1 MW ground -mounted solar PV system that will produce 1,292 kW -DC annually of clean, renewable energy that <br />offsets the energy usage of the high school building <br />Gii•aysIllla ke Coiioi�i'nuiiitl[tS Coiinsollii'diated ScIII°tooIII 11'111fiiistiirm ct 46, Ill l���m, 2019 <br />Total Contract: $7,300,068 (Solar PV) <br />• 2.4 MW solar PV system with an estimated production of 2,900,000 kWh, producing $14.1 million in savings over <br />30 years <br />• Two roof -mounted arrays at Park Campus and Grayslake Middle School and two ground -mounted arrays at <br />Prairieview Elementary and Frederick Elementary <br />Delll4sllhfl CumniiioumiitftS Scllhsool Comm;)oiii°atitloiut, IIIIIIS, 2(':'i' 7 <br />Total Contract, Ph.1-11: $5,928,891 (Solar PV with GESC) <br />• 1.68 MW solar PV system that will offset an estimated 95% of combined electrical usage at the two buildings <br />• The system will provide an education opportunity for students utilizing the National Energy Education <br />Development (NEED) Project curriculum <br />Cfal< Ilh°°liiillllll CoiistirouuiiiniiitySsllhtoolll Coiim'lllcoiirat,loiiit, IIIIIISp 20 7 <br />Total Contract: $4,800,000 (Solar PV with GESC) <br />1.89 MW ground -mounted solar PV system that will offset an estimated 78% combined electrical usage at the <br />two buildings <br />EDUCATION <br />h'idiiiaiina Ui"mltreirsl°l:y f'u�uui°�Juue Lhinivem° swfy Ill tdii�a�°'iallfcn�lllus Masters of Electrical Engineering, 2016 <br />llnni lliiana Sliriiiaeirsiity...Pumrduue U niivei�i,slty Illnidli'aria llcolllis Bachelors of Electrical Engineering, 2014 <br />CERTIFICATIONS <br />NABCEP PV Design Specialist <br />Lean Six Sigma Certificate - Green Belt, 2016 <br />Alerton Certified Engineer, 2017 <br />Tridium - Niagra 4Technical Certification, 2017 <br />
The URL can be used to link to this page
Your browser does not support the video tag.