Laserfiche WebLink
�i <br />Performance <br />Services <br />kbaum@performanceservices.com <br />www.performanceservices.com <br />1111K Id IIII° Elam, III IIIIIIIIIIIIII'16 <br />SENIOR PROJECT DEVELOPMENT ENGINEER <br />Kevin joined Performance Services in 2005 and has 24 years of experience creating <br />and managing unique solutions for building systems focused on the assessment and <br />design of HVAC, heat recovery, and industrial systems. He has experience in a variety <br />of markets including K-12 schools, government, higher education, healthcare, <br />manufacturing, and industrial. Kevin enjoys having ownership of his design from <br />concept to commissioning. As a lead engineer, he is responsible for developing <br />energy and cost savings solutions for customers. <br />PROJECT HIGHLIGHTS <br />Ciiity of iVir°tdiaiiia1(,�iolllir;,;, 2012 <br />Total Contract: $15,000,000 (GESC) <br />• Greening of City -County Building - HVAC upgrades and improvements, geothermal system to support building <br />heating and cooling, solar thermal and PV systems installed <br />• Designed and implemented deep energy retrofits for 15 city buildings <br />iPa irlll[miiiri Ciillllllege, 2(YI 7 <br />Total Contract: $3,812,000 (GESC) <br />• Upgrade campus lighting to LED in athletic complex, residence halls, and academic buildings <br />• Water conservation, seal building envelopes, chilled water plant optimization, upgrade HVAC systems, expand <br />campus digital controls <br />11r°riJoirro Sta ioiri, 2007 <br />Total Contract: $2,322,000 (GESC) <br />• Installed new closed loop towers, motor horsepower significantly reduced, replaced pumping system with two <br />primary loops, re -piped central plant <br />• Installed new web -based digital controls with graphical workstation <br />• Services maintained with no major disruption to Union Station and Crowne Plaza tenants <br />1t) 1,°Iemrtllllrn, i\N@eih',)r)hiid )014I 015� <br />Total Contract, Ph.1-II: $5,693,341 (Integrated Design & Delivery) <br />• Installation of key environmental equipment, control system components, and sequence programming in the <br />operating room suites that provide specific temperature, humidity, and pressurization control <br />• Indoor environmental quality for OR meets or exceeds code requirements and comfort needs <br />• 1 million kWh of electricity saved annually while improving infection control <br />EDUCATION <br />�inr iie iiiiiiv rsity- Mechanical Engineering, 1992 <br />CERTIFICATIONS <br />[Irofa�ssior')aV II iii�'iirreeir Indiana license #10100828 <br />ASSOCIATIONS <br />American Society of Mechanical Engineers MINE <br />IN U <br />INDIAMNA <br />American Society of Heating, Refrigerating, and Air Conditioning Engineers, Inc. (ASHRAE) <br />Association of Enerqv Engineers <br />