My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
RFQ - SBFD Solar PV - Performance Services Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
RFQ - SBFD Solar PV - Performance Services Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 2:22:03 PM
Creation date
8/28/2019 11:13:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/27/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
N� <br />Performance <br />Services <br />eflake@performanceservices.com <br />www.performanceservices.com <br />Ed Flaice, I� <br />SENIOR ELECTRICAL ENGINEER <br />Prior to joining Performance Services in February of 2016, Ed dedicated 28 years <br />to electrical engineering design consulting work. 24 of those years were spent in <br />consulting work. He also spent time in electrical contracting as an owner/installer. <br />Ed has designed complete lighting, solar power and electrical systems for new <br />construction and renovation projects of all types, including healthcare, residential, <br />commercial and educational facilities. <br />PROJECT HIGHLIGHTS <br />Qrayclalw Salio6ll 111Xsfuiiict; 12/„ ruby16 <br />Total Contract: $5,900,458 (Solar) <br />• 501 kw roof mount solar panels at Grayslake Central High School <br />• $2 million in expected annual utility savings over 25 years <br />• 775 kw roof mount solar and 1,410 kw ground mount solar at Grayslake North High School <br />• $6.6 million expected annual utility savings over 25 years <br />Oa1°°li1l Uiriiited SdI,iawpol Coirpl:.uoiratiiiic„piirm, 20 i 7 <br />Total Contract: $4,800,000 (Solar) <br />• Two ground mount systems at Oak Hill Senior High School and Junior High School <br />• 1.89 Megawatt system <br />• $6.3 million estimated savings over 30 years <br />ll.folllpIfli 5:oiiemirnunRly Sclio6ll CorIIpoirafloii 1, 2017 <br />Total Contract: $5,928,891 (Solar and LED Lighting) <br />• Two ground -mount solar arrays <br />• 1.69MW; $6.4 million net savings over 30 years <br />EDUCATION <br />f'r. se IlI lUirnan Illris ltute of""'Iil?c,'°n'i6logy BS in Electrical Engineering, 1990 <br />CERTIFICATIONS <br />2i�i'ofessioiir4l Indiana license #PE10606339 <br />MEM <br />INK <br />�. <br />INDIANA <br />
The URL can be used to link to this page
Your browser does not support the video tag.