My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Task Order No 7 - Stantec Consulting Services Inc - New LTCP Renegotiation
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Task Order No 7 - Stantec Consulting Services Inc - New LTCP Renegotiation
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:12:34 AM
Creation date
8/15/2019 10:54:21 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 7.3: Water Quality Modeling and Analysis — In response to direction from CLIENT, <br />CONSULTANT shall provide services related to the performance and documentation of additional water <br />quality model simulations and analysis as required to respond to CLIENT or Regulatory Agency requests <br />Modeling services may include modification of the St. Joseph River water quality model to reflect revised <br />simulation conditions or CSO overflow conditions, performance of model simulations, documentation of <br />model results, and senior level quality reviews of model analyses. Results from model simulations will <br />be documented in technical memoranda that include detailed references to the date and name of the model <br />input files used as the basis for each analysis. <br />Task 7.4: SAGE Plan Concept Design - CONSULTANT will perform conceptual design analyses as <br />required to revise and improve the projected performance of the SAGE Plan to meet the City's objectives. <br />Specific analyses will be performed based on discussions with CLIENT and/or Regulatory Agency <br />requests. Analyses may be required to address issues such as those listed below: <br />• Development of design details for modification of existing regulators and/or dry weather flow <br />(throttle) pipes, revising the size and configuration of the regulators, preliminary design of weir <br />lengths and elevations, gate locations, and installation of gate controls with level sensors to <br />reduce CSO frequency, duration, or volume. <br />• Development of conceptual design details including adjusted storage volumes, site and <br />interceptor modification layouts, hydraulic profiles, and sewer configurations for the proposed <br />storage facilities at the South Bend WWTP, Memorial Park, and near the intersection of <br />Randolph and Sampson Streets. <br />• Modification or enhancement of the existing CSONet Smart Sewers system to improve the <br />control of flows within the local collection system and reduce CSO overflow volume. <br />• Development of revised cost estimates or implementation schedules. <br />Conceptual design analyses performed will be documented in technical design memoranda that include <br />conceptual drawings, a summary of key design criteria/parameters, an opinion of probable construction <br />cost (AACE Class 4), and a summary of major constructability or implementation challenges. <br />Task 7.5: Financial Capability Assessment (FCA) Updates — If requested by CLIENT, CONSULTANT <br />will provide services required to respond to regulatory agency comments pertaining to the City's <br />Financial Capability Assessment. <br />Task 7.6: LTCP Team Strategy Meetings - CONSULTANT team members will participate in periodic <br />strategy calls or meetings with the CLIENT and the Legal team to assist in development of a negotiation <br />strategy and identify discussion topics for regulatory meetings as discussed in Task 7.1. If directed by <br />CLIENT, CONSULTANT will prepare written meeting notes to document discussions during these <br />meetings. <br />Task 7.7: Advisory Committee Meetings — If directed by the CLIENT, CONSULTANT will coordinate <br />with CLIENT to plan, schedule, prepare for, participate in, and document a meeting with the CLIENT's <br />CSO LTCP Advisory Committee. It is assumed that meetings with the Advisory Committee will be held <br />in South Bend at a location arranged by the CLIENT. CONSULTANT will support CLIENT in efforts to <br />coordinate Advisory Committee meetings, but all direct communication with the Advisory Committee <br />will be through the CLIENT. Services under this task may include, but are not limited to: <br />- Coordination of schedule <br />Preparation of agenda for meetings <br />
The URL can be used to link to this page
Your browser does not support the video tag.