My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 315 & 319 W Jefferson Exterior Renovations Project No 119-064 - Herrman & Goetz Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - 315 & 319 W Jefferson Exterior Renovations Project No 119-064 - Herrman & Goetz Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 8:33:26 AM
Creation date
8/15/2019 8:44:59 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/13/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
89
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
During the first two years after the implementation of this revised plan, all members will be <br />subject to the new random testing program. During this two-year period, two pools will be <br />established. One is the drug -free pool which will contain those members who 1.) have been <br />selected for testing and have tested negative for controlled substances and 2.) have not been <br />selected for testing. The Ineligible pool will be populated by those members who 1.) have tested <br />positive for controlled substances and have not followed through on the prescribed actions as <br />detailed in the "Protocol for a Positive Test"; and 2.) have been selected for testing and for <br />whatever reason did not report for testing. <br />The basic format of the program will be a 50% Random testing of the Drug Free Poll and all <br />members of the Drug Free Poll will be tested at least once every two (2) years. As stated <br />previously, the program will start with all members in the Drug Free Pool. Monthly, the plan <br />administrator will generate a list of members for testing and this list will be forwarded to the <br />Local Union 153 Hall. The staff at the Local Union 153 Hall shall segregate the list by <br />contractor and forward the list on the appropriate contractors. The contractors will print the <br />attached letters and distribute them to the required employees. A two -week window will be <br />allowed from the time the names are pulled to testing. The contractors will distribute the letters <br />and mark the date and time the letters were distributed to the members. The members will be <br />required to stop on their way home from work at the nearest testing site and submit to testing. If <br />the member is unable to stop for testing on his/her way home from work, they must submit to <br />testing before reporting back to the jobsite the following morning. The member shall present <br />his/her copy of the chain of custody form from the testing site as proof that the member <br />Visage 8 of 3 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.