Laserfiche WebLink
High Concrete Group LLC <br />Job Name: Commerce Center <br />Date: May 28, 2019 <br />Estimate: 19-03-033 <br />QUANTITIES: 943 pieces - 77,852 sq. feet <br />MIXES AND FINISHES: <br />FACE MIX: Buff Limestone (local material only) <br />FACE FINISH; Light acid -etched finish with formliner to simulate limestone finish — will also be mortar color <br />between thin -brick <br />BACK UP MIX: Plain Grey (non -architectural) <br />BACK UP FINISH: Wood Float WF-1 @ all non -exposed panel backs, and ST-1 "one pass" hand steel trowel @ <br />roof parapet above roof line only <br />RICK CN',,,,,AD PRECAST <br />Thin Brick Manufacturer: Metro Brick <br />Size of Thin Brick Provided Utility u <br />Color & Texture of Thin Brick Provided: 350 Main Street f �� lacy tt p a w M,� rc � r � 9 ,1 sn cr c), . (Li g11N.. e g `) <br />Liner Type Provided: �]CC Ch,olc ,, <br />Joint Type Provided: Mild Recess ToOed <br />Joint Color Provided: Same as "Non -Brick" areas (adding a second joint color would be an additional cost) <br />Brick is to be PCI or TB -Grade & Tolerance. <br />In the event of any conflict between this Milestone Provision and any Contract Document, including the Prime Contract, this <br />Milestone Provision shall control unless agreed otherwise. <br />The Project Schedule and Contract Sum are contingent upon timely fulfillment of each Project Milestone. Active cooperation <br />and coordination by Contractor, including the management and coordination of other subcontractors and suppliers within <br />Contractor's control, are all requirements for fulfilling the Project Milestones. Contractor's failure to fulfill any Project <br />Milestone may result, in addition to damages, in a Project Schedule adjustment, the duration of which shall be at the <br />discretion of Subcontractor. A failure by Contractor to fulfill any Project Milestone shall release Subcontractor from any <br />liability or any damages resulting there from. Contractor shall be responsible for damages, including but not limited to, actual <br />costs of Subcontractor resulting from missed Project Milestones, any rescheduling costs, Subcontractor's then current <br />monthly storage rates for Subcontractor's plant storage yard or, the actual costs of an offsite storage lease, transport, labor, <br />associated crane and equipment costs and other actual costs concerning the storage of the product until delivery may be <br />accomplished with Subcontractor's then available resources. Additionally, Subcontractor shall be permitted a ten percent <br />(10%) mark-up for profit and a ten percent (10%) mark-up for overhead as applied to such increased costs for manufactured <br />products. Such reimbursement by Contractor shall occur within thirty (30) days of Subcontractor's request therefore and is <br />not contingent upon Contractor receiving payment from its customer. <br />5 <br />