My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Commerce Center Arch Precast Concrete Panels Project No 119-030 - High Concrete Group LLC
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Commerce Center Arch Precast Concrete Panels Project No 119-030 - High Concrete Group LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:04:42 AM
Creation date
5/29/2019 11:04:55 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
5/28/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
91
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
High Concrete Group LLC <br />Job Name: Commerce Center <br />Contractor acknowledges and rgreews to the below Project milestones: <br />• <br />Order Thin Brick Material: <br />Contract Executed: <br />Submit 12"x 12" Color & Texture Samples: <br />Approval of 12"x 12" Color & Texture Samples y: <br />3'x 5' Mock-up Approval: <br />Start Shop Drawing & Design Calculations: <br />Submit Shop Drawings & Design Calculations: <br />Receive "Approved" Shop Drawings & Design Calcs: <br />Date: May 28, 2019 <br />Estimate: 19-03-033 <br />TBD (must contain language <br />payment for upfront shop <br />embeds, and thin brick procurement) <br />(16) week lead time estimated <br />within 30 days of receipt <br />TBD <br />within 2 weeks of submission <br />TBD <br />within 1 week of receiving contract <br />TBD <br />within 2 weeks of submission <br />that guarantees <br />drawings, field <br />Additional Controls: <br />1. Engineering shop drawing approval and review duration is 10 working days. Response time for R.F.I.'s is <br />to be within 5 working days. <br />2. Delayed schedules will be subject to available production slots, not day for day delays. <br />3. Contract documents and specifications must be received prior to written Notice to Proceed, to allow <br />Engineering to commence. <br />4. Trade related coordination documents and information must be provided (8) weeks prior to scheduled <br />production start date. <br />.VeliMute: <br />• Production of precast elements is scheduled to commence: November 7, 2019 <br />• Erection of Precast elements is scheduled to commence as follows: <br />o Phase 1 — Grade to Level 5 - December 9, 2019 <br />o Phase 2 — Level 5 to Roof — February 10, 2020 <br />W 'BE/ WE PggjEi � <br />Company++ of <br />2. i <br />"1' '.1`AL .PERCENTAGE OF M . .E PARTICIPATION -w- MINIMUM 2.11. % OF CONT. C'I' <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.