Laserfiche WebLink
High Concrete Group LLC <br />Job Name: Commerce Center <br />Date: May 28, 2019 <br />Estimate: 19-03-033 <br />STANDARD SCOPE INCLUSION / EXCLUSION CHECKLIST <br />INC EXC <br />SITE ISSUES <br />❑ <br />® <br />Caulk — Panel to C.I.P. <br />® <br />❑ <br />Caulk - Panel -Panel Joints <br />❑ <br />® <br />Water Repellant Coating or Sealers <br />❑ <br />® <br />Permits (other than required for shipping) <br />❑ <br />E <br />Traffic Control <br />E <br />❑ <br />Patching — As a result of operations during delivery <br />❑ <br />E <br />Winter Protection or snow removal of any kind <br />❑ <br />E <br />Field measuring of any kind <br />❑ <br />E <br />Underground shoring or tunnels or protection of underground utilities <br />❑ <br />E <br />De-watering/cleaning of foundations/Snow Removal <br />❑ <br />E <br />Wheel washing of truck tires or cleaning of mud or debris <br />❑ <br />E <br />Demolition or removal of any existing materials <br />❑ <br />E <br />Expansion Joints or Expanding joint sealers— Material & Installation <br />❑ <br />E <br />Complete Building Wash down after Installation. <br />E <br />❑ <br />Panel Cleaning — cleaning of debris caused by shipping only <br />❑ <br />E <br />Installation or maintenance of access roads for truck access <br />❑ <br />E <br />Onsite shuttle lot for truck/trailer staging and storage <br />❑ <br />E <br />Local Load Shuttle performed by any union entity <br />❑ <br />E <br />Street Sweeping of any kind <br />PROJECT SPECIFIC CLARIFICATIONS <br />1. CONTRACT DRAWINGS: We require a CD with complete Contract Drawings and Specifications prior to start of <br />engineering and detailing. <br />2. QUALITY CONTROL: HCG qualifies that production and curing practices will be in accordance with PCI <br />recommendations, exception is taken to any special production, curing or storage requirements, including any <br />requirement that the precast must be at 28-day strength prior to shipment & erection in the structure. <br />3. PRECAST DESIGN: High Concrete Group LLC will utilize standard product design and connection details for <br />precast concrete components (performance design). Pricing includes components and design allowances for <br />conditions reflected in the design documents. <br />4. General Contractor/Construction Manager shall be responsible for leading and managing the coordination between <br />trade contractors. <br />5. HCG Excludes Geotechnical analysis or subsurface investigations to verify bearing pressures for truck and crane <br />operations. The site surface must be designed by others to support hoisting and hauling equipment required for <br />precast operations. <br />6. MATERIALS SUPPLIED BY OTHERS: Materials supplied by others for inclusion in precast products must be <br />supplied with the proper layout information six (6) weeks prior to scheduled start of production. <br />7. CAST IN ELECTRICAL CONDUITS: No provisions are included to embed any electrical conduits within the precast. <br />8. JOINT SEALANTS: HCG proposal "Includes" providing all precast -to -precast joint sealants. <br />9. WATER REPELLENT COATINGS: HCG proposal "Excludes" providing any Water Repellent Coatings. <br />10. CRANE / TRUCK ACCESS: HCG proposal is based upon having crane and truck access as shown in the attached <br />Site Logistics Plan prepared by High Concrete from a site visit on 4/30/19. <br />11. BRACING OF SUPERSTRUCTURE: HCG proposal "Excludes" all bracing of the building frame. <br />12. BRICK -JOINT TUCKPOINTING: FICG proposal "Excludes" tooling or tuckpointing of thin -brick joints as bricks are <br />laid into a special form liner that provides the clean, crisp joints. <br />13. THIN BRICK LEAD TIME: Please note that the lead time for the thin brick material can be extensive. HCG has seen <br />as much as 16 weeks for some thin brick material. <br />14. PANEL THICKNESS: HCG estimate is based various 11" thick precast panels in most areas, based on the 5" <br />interior wythe, 3" insulation and 3" exterior wythe. Per Addendum #3, precast panels in the garage areas where <br />exposed to the outside will be 8" thick solid units with no insulation. <br />113 <br />