Laserfiche WebLink
High Concrete Group LLC Date: May 28, 2019 <br />Job Name: Commerce Center Estimate: 19-03-033 <br />STANDARD SCOPE INCLUSION / EXCLUSION CHECKLIST <br />INC EXC <br />MATERIALS <br />® <br />❑ <br />"Loose" Precast Panel Connection Hardware Finish -Galvanized <br />® <br />❑ <br />Field Embedded C.I.P. Hardware — Material Only F.O.B. jobsite to be Site <br />Cast "by others" in Field Poured Concrete Finish -Galvanized <br />® <br />❑ <br />Reinforcing Bar -Precast Products: Finish: Plain <br />® <br />❑ <br />Wire Mesh — Finish: Plain <br />® <br />❑ <br />Plant Installed Connection Hardware Finish -Galvanized <br />® <br />❑ <br />Grout Base Joint Continuous <br />® <br />❑ <br />Thin Brick Veneer - Metro Brick — 350 Main Street & 101 Commons <br />❑ <br />® <br />Reglets - Field applied if required by others. <br />® <br />❑ <br />C-Grid System <br />® <br />❑ <br />3" Extruded -Polystyrene (XPS), Type VII, Insulation Cast into the Panels <br />® <br />❑ <br />Three (3) Full -Size (3' x S) Mock -Ups (one for faux -limestone formliner, one <br />for Maroon thin -brick & one for light beige thin -brick) shipped to site and <br />erected on frame supplied by others <br />® <br />❑ <br />Pre -production Mock -Up (2) 1 ft. x 1 ft. to be reviewed at HCG plant <br />® <br />❑ <br />Wood blocking strips @ window and door openings <br />❑ <br />® <br />Curtain Wall Anchors <br />❑ <br />® <br />Offsite Test Mock -Up at Testing Lab <br />❑ <br />® <br />Electrical assemblies supplied by Trade Co per HCG Engineering criteria. <br />All assemblies to be completely fabricated and ready for placement <br />❑ <br />® <br />Flashing material or installation of any kind <br />❑ <br />® <br />Testing: Independent Testing Labs or inspection by an outside inspection <br />laboratory/contractor. HCG is providing standard PCI "in-house" testing. <br />FIELD ITEMS <br />EXC <br />❑ "Erector performed" Pre -installation layout. Control lines and <br />elevation benchmarks are to be provided by the GC/CM <br />® Complete Survey of all Embedded C.I.P. plates/angles <br />® Fireproofing removal from Steel Structure <br />® Grinding of galvanizing before welding <br />® Precast panel protection - following erection <br />® Openings required in roof deck or floors for rigging of panels to be installed <br />underneath at set back areas. <br />® "On site" or "off site" Mock-up Installation <br />® Off shift erecting times (2"d or 3,d shift) <br />® Dedicated Fulltime Fire Watch or Safety Rep. — Standby Personnel <br />❑ Off Site Parking for All Employees except company foreman <br />❑ Projected Labor rates for work into the 2nd quarter of 2020 <br />2 <br />