Laserfiche WebLink
REGULAR MEETING <br />MARCH 26, 2019 68 <br />upon a motion made by Ms. Maradik, seconded by Ms. O'Sullivan and carried, the above request <br />was approved. <br />AWARD QUOTATION — 2019 VENUES PARKS AND ARTS CEMETERY MOWING <br />(VPA MAINTENANCE) <br />Mr. Patrick Sherman, Venues, Parks and Arts, advised the Board that on March 12, 2019, <br />quotations were received and opened for the above referenced project. After reviewing those <br />quotations, Mr. Sherman recommended that the Board award the contract to the lowest <br />responsive and responsible bidder, Michiana's Four Seasons Landscaping, 24449 Rolling Oaks <br />Drive, South Bend, IN 46628, in the amount of $43,180 for the Base Quote plus Alternate No. 1. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the quotation <br />be awarded as outlined above. Ms. O'Sullivan seconded the motion, which carried. <br />AWARD QUOTATION — LOT 12 US 31 INDUSTRIAL - LANDSCAPE WORK — PROJECT <br />NO. 119-029 (RWDA TIF) <br />Mr. Zach Hurst, Engineering, advised the Board that on March 12, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Mr. <br />Hurst recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Fuerbringer Landscaping and Design, Inc., 22530 Brick Rd., South Bend, IN 46628, in <br />the amount of $52,110. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Ms. O'Sullivan seconded the motion, <br />which carried. <br />AWARD QUOTATION — CENTURY CENTER SITE IMPROVEMENTS — PROJECT NO. <br />118-101 (HOTEL/MOTEL TAX) <br />Ms. Becca Plantz, Engineering, advised the Board that on March 12, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Acorn Landscaping, LLC, 3680 W. Sample Street, South Bend, IN 46619, in the amount <br />of $131,069.02 for the base quote only. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. O'Sullivan <br />seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 1 — MIAMI STREET BASIN DRAINAGE <br />IMPROVEMENTS —PROJECT NO 116-082C (SSDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of HRP Construction, Inc., 5777 Cleveland Road, South Bend, IN 46624, indicating the contract <br />amount be increased by $8,780, plus an additional one -hundred, thirty-nine (139) days for a new <br />contract sum, including this Change Order, in the amount of $501,780 and a new project <br />completion date of May 12, 2019. Upon a motion made by Ms. Maradik, seconded by Ms. <br />O'Sullivan and carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO. 10 — ERSKINE CLUBHOUSE RENOVATION — <br />PROJECT NO. 116-108 (VPA CAPITAL) <br />Mr. Gilot advised that Mr. Kyle Silveus, Engineering, has submitted Change Order No. 10 on <br />behalf of Ziolkowski Construction, Inc., 4050 Ralph Jones Drive, South Bend, IN 46628, <br />indicating the contract amount be increased by $14,689 for a new contract sum, including this <br />Change Order, in the amount of $1,091,531. Upon a motion made by Ms. Maradik, seconded by <br />Ms. O'Sullivan and carried, the Change Order was approved. Mr. Gilot noted the Board was <br />informed that the majority of the changes on this project are due to unforeseen differing site <br />conditions, discovered during excavation. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — EDISON PRODUCTION WELL NO. <br />2A REHABILITATION — PROJECT NO 118-103 (WATER WORKS O&M) <br />Mr. Gilot advised that Ms. Becca Plantz, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Peerless -Midwest, Inc., 55860 N. Russell Industrial Parkway, Mishawaka, <br />IN 46545, for the above referenced project, indicating a final cost of $63,140. Upon a motion <br />made by Ms. Maradik, seconded by Ms. O'Sullivan and carried, the Project Completion <br />Affidavit was approved. <br />APPROVE PROJECT COMPLETION AFFIDAVIT — OLIVE PRODUCTION WELL NO. 6 <br />REHABILITATION — PROJECT NO 118-102 (WATER WORKS 0&M) <br />Mr. Gilot advised that Ms. Becca Plantz, Engineering, has submitted the Project Completion <br />Affidavit on behalf of Peerless -Midwest, Inc., 55860 N. Russell Industrial Parkway, Mishawaka, <br />