Laserfiche WebLink
REGULAR MEETING FEBRUARY 12.2019 30 <br />OPENING 0 <br />�IMENI OFFICE IMPROVEMENTS <br />(CODE ENFQRCEMENTJ <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed quotations for <br />the above referenced project. The following quotations were opened and read: <br />BROWN AND BROWN GFNERAL CONTRACTORS, INC. <br />124 S. Elkhart Street, PO Box 487 <br />Wakarusa, IN 46573 <br />Quotation was submitted by Eric Brown <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $4,776.00 <br />ZIOLKOWSKI CONSTRUCTION, INC. <br />4050 Ralph Jones Drive <br />South Bend, IN 46628 <br />Quotation was submitted by Bill Favors <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />QUOTATION: $6,150.00 <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above <br />quotations were referred to Engineering and Central Services for review and recommendation. <br />AWARD BID — LIBERTY TOWER EXTERIOR RENOVATIONS, DIVISION A -- PROJECT <br />NQJ 18-086R RWDA TIF <br />Mr. Kyle Silveus, Engineering, advised the Board that on January 22, 2019, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder <br />Slatile Roofing and Sheet Metal Co., Inc., 1703 S. Ironwood Dr., South Bend, IN 46613 in the <br />amount of $274,218. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the bid be awarded as outlined above. Ms. Fritzberg seconded the motion, which <br />carried. <br />AWARD 0 OTATION — CENTURY CENTER STORAGE MEZZANINE — PROJECT NO. <br />LLQME HO°l"ELlMOTEL TAM <br />Ms. Becca Plantz, Engineering, advised the Board that on January 22, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, R. Yoder Construction, Inc., 27453 County Road 150, Nappanee, IN 46550, in the <br />amount of $104,000. Therefore, Ms. Maradik made a motion that the recommendation be <br />accepted and the quotation be awarded as outlined above. Ms. Fritzberg seconded the motion, <br />which carried. <br />AWARD �UOTA�TION — �BENDIXFFIE�,AIER LIFT AT �CEN�TURY CENTER �_PRQJEcr <br />NO, 118-036C'HOTEL/MOT <br />Ms. Becca Plantz, Engineering, advised the Board that on January 22, 2019, quotations were <br />received and opened for the above referenced project. After reviewing those quotations, Ms. <br />Plantz recommended that the Board award the contract to the lowest responsive and responsible <br />bidder, Brown and Brown General Contractors, Inc., 124 S. Elkhart Street, PO Box 487, <br />Wakarusa, IN 46573, in the amount of $71,300, Therefore, Ms, Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Fritzberg <br />seconded the motion, which carried. <br />RATIFYQUOTATION AWARD — GRAND STAND MULTI FORCE WITH 60" DECK - <br />���� <br />(2016 VPA EQUILPMENNT ILEASIE PROCEE <br />DS <br />E—D S) <br />Mr. Jeff Hudak, Central Services, advised the Board that on October 23, 2018, quotations were <br />received and opened for the above referenced equipment. After reviewing those quotations, Mr. <br />Hudak awarded the contract to the lowest responsive and responsible bidder, Yard N Gard, 919 <br />E. Mishawaka Road, Elkhart, IN 46517, in the amount of $32,277.98. Mr. Michael Schmidt, <br />Purchasing, requested the Board now ratify that award that was done without Board approval by <br />