My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2 Agenda
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
08-16-12 Packet
>
2 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:49:54 AM
Creation date
8/13/2012 1:37:42 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Regular Meeting —July 26, 2012 <br />6. NEW BUSINESS (CONT.) <br />B. Airport Economic Development Area <br />(1) Proposal for environmental services <br />related to 635 S. Lafayette Blvd. (Ivy <br />Tower building) <br />Ms. Kolata noted that the Commission has <br />entered into an MOU with Union Station <br />Properties that includes environmental <br />remediation at the current Ivy Tower <br />property. That included providing a Phase I <br />and Phase II Environmental Assessment, <br />including assessment of asbestos and lead <br />based paint currently in the building. <br />Recently we have determined. that a third <br />environmental issue, transformers and <br />associated PCBs, will need to be addressed <br />as part of the site clean -up. There are four <br />transformer rooms and each unit within the <br />rooms will need to be investigated and likely <br />need remediation. Also, the concrete floors <br />of the transformer rooms need to be <br />investigated to determine whether PCB <br />contamination is present and, if so, what <br />remediation needs to take place. Weaver <br />Boos was selected to handle the remediation <br />based on their work at the former foundry <br />demolition, handling a complicated <br />remediation in a very efficient manner. <br />Weaver Boos will also assist us in <br />coordinating the remediation work with the <br />rehabilitation of the building by the private <br />developer. <br />The Proposal outlines the following four <br />tasks: <br />1. Review the environmental <br />information that is currently available <br />and conduct a comprehensive walk <br />Z <br />
The URL can be used to link to this page
Your browser does not support the video tag.