Laserfiche WebLink
Zq <br />ALLIANCE <br />929 Lincolnway East, Suite 200 1 South Bend, Indiana 46601 <br />CONSTRUCTION CHANGE DIRECTIVE <br />DIRECTIVE NO.: 2 TO: <br />PROJECT: HOWARD PARK REDEVELOPMENT <br />219 South St. Louis Blvd. <br />South Bend, IN 46617 <br />OWNER: CITY OF SOUTH BEND <br />SOUTH BEND VENUE, PARKS <br />AND ARTS <br />301 South St. Louis Blvd. <br />South Bend, IN 46617 <br />Larson Danielson <br />302 Tyler Street <br />La Porte, IN 46350 <br />CONTRACT DATE: October 4, 2018 <br />DATE OF ISSUANCE: November 28, 2018 <br />ARCHTECT'S PROJECT NO: 072 <br />You are hereby directed to make the following change(s) to the Drawings and/or Specification: <br />1.01 Sheet A1.6: <br />A. Reference Pergola Plan ...Change the following: <br />1. Delete north bay of pergola, including, but not limited to, concrete foundation, <br />steel columns (2), steel beam (3), and cedar joists. <br />2. Delete "Colored" concrete as shown. <br />B. Reference Pergola 3D Irma ...(not shown) Delete north bay of pergola, including, <br />but not limited to, concrete foundation, steel columns (2), steel beam (3), and cedar <br />joists. <br />C. Reference Details 1/A1.6 & 2/A1.6 ...Change details to show the following: <br />1. Concrete Footing: 2'-6" x 2'-6" x 12" W/ 3 - #5 Bar, Each Way, A Bottom. <br />2. Concrete Pier: 16" x 16" W/ 4 - #5 Bar Vertical W/ #3 Ties @ 12" O.C. <br />3. Baseplate: 12" x 12" x 3/8" Steel Baseplate W/ 4 — 1/2" Anchors — 8" Long. <br />4. Steel Column: W8 x 21 — See Addendum No. 4'— Add 8" x 5 1/2" x 1/4" Top Plate <br />5. Steel Beam: W 10 x 19 — See Addendum No. 4 <br />6. Steel Beam to Steel Column Connection: See Structural Details 1/S0.2 and <br />2/S0.2 — Delete Welded Connection <br />7. Wood Joist Connection to Steel Beam: 4 x 3 x 1/4 x 8" Long Steel Angle, Long <br />Leg to Wood W/ 2 — 3/4" Bolts @ 3" O.C.(A307) <br />8. Delete "colored" concrete as shown — Make concrete banding detail monolithic <br />with slab as shown. <br />