My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Howard Park Redevelopment and St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - Howard Park Redevelopment and St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:56:39 PM
Creation date
1/24/2019 8:25:48 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. Reference Column Detail 3/A1.8 ...Change details to show the following: <br />1. Steel Column: W8 x 21 — See Addendum No. 4 — Add 8" x 5 1/2" x 1/4" Top Plate <br />2. Steel Beam: W10 x 19 — See Addendum No. 4 <br />3. Steel Beam to Steel Column Connection: See Structural Details 1/S0.2 and <br />2/S0.2 — Delete Welded Connection. <br />4. Delete "colored concrete as shown - Make concrete banding detail monolithic <br />with slab as shown. <br />The Contractor shall proceed with the change(s) described above. The Architect shall prepare a Change Order <br />document, if necessary, to adjust the Contract Sum and/or Contract Time for changes reflected herein. <br />End of <br />Construction Change Directive No. 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.