My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - Howard Park Redevelopment and St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction Co
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - Howard Park Redevelopment and St Louis Blvd Improvements Project No 117-047B - Larson Danielson Construction Co
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:56:39 PM
Creation date
1/24/2019 8:25:48 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
1/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
/'. % f <br />MAN <br />Change Request <br />�j <br />To: Myron Cohagan <br />LOCHMUELLER GROUP <br />130 SOUTH MAIN ST., STE 300 <br />SOUTH BEND, IN 46601 <br />Ph:(574)334-5488 <br />Description: CR # 13 CCD # 2 Pergola Foundations <br />Reason: Owner Request <br />302 Tyler Street <br />LaPorte, IN 46350 <br />Ph: 219-362-2127 <br />Number: 13R <br />Date: 12/18/18 <br />Job: 56-445 HOWARD PARK -REDEVELOPMENT <br />Phone: <br />We are pleased to offer the following specifications and pricing to make the following changes: <br />All labor, material and equipment to excavate, form, pour, strip footings and piers, and backfill the ten pergola foundations per CCD # <br />2 <br />Description <br />Labor <br />Material Equipment <br />Subcontract <br />Other <br />Price <br />Indiana Earth Cost <br />$4,288.00 <br />$4,288.00 <br />Wilson Iron Works Cost - No Cost <br />FWR Cost Tie 400 Ibs Rebar <br />$260.00 <br />$180.00 <br />$440.00 <br />100 sf Spread Footing Forms 16 CA Hrs @ $ <br />$864.00 <br />$125.00 <br />$989.00 <br />54/hr <br />125 sf Pier Formwork 32 CA Hrs @ $ 54/hr <br />$1,728.00 <br />$156.00 <br />$1,884.00 <br />Pour 2.3 cy Footings Concrete 2.5 CF Hrs @ $ <br />$132.50 <br />$270.00 <br />$402.50 <br />53/hr <br />Pour 1.53 cy Pier Concrete 4 CF Hrs @ $ 53/hr <br />$212.00 <br />$175.00 <br />$387.00 <br />Set 40 ea Anchor Bolts 13.3 CA Hrs @ $ 54/hr <br />$718.20 <br />$718.20 <br />Delete 198 If Cedar 2 x10 Joists 4 CA Hrs @ $ <br />$-216.00 <br />$-907.50 <br />$-1,123.50 <br />54/hr <br />Subtotal: <br />$7,985.20 <br />OH & P - Labor <br />$3.654.70 <br />20.00% <br />$730.94 <br />OH&P - Material <br />$986.00 <br />12.00% <br />$118.32 <br />OH&P - Equipment <br />$0.00 <br />OH&P <br />- Subcontractor (First 3K) <br />$3,000.00 <br />10.00% <br />$300,00 <br />OH&P <br />- Subcontractor (After 3K) <br />$1,468.00 <br />7.00% <br />$102.76 <br />Bond Markup <br />$9.237.22 <br />1.00% <br />$92.37 <br />Total: $9,329.59 <br />If you have any questions, please contact me at (219)575-6085. <br />Submitted by: Darin Meyer Approved by: <br />LARSON-DANIELSON CONST. CO INC Date: <br />Cc: Nucciarone; Joe (ALLIANCE ARCHITECTS), Villa; Toy (SOUTH BEND, CITY OF), Lamie; Bill (ALLIANCE ARCHITECTS) <br />Page 1 of 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.