My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/07/1917 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1917
>
08/07/1917 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 1:14:46 PM
Creation date
1/3/2019 1:05:52 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/7/1917
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
731 <br />Bids were received for pavement improvement on Mishawaka Avenue from <br />Eddy Street to center of. Nineteenth Street, under Improvement Resolution No. 546. <br />Bid of Williston Construction Company. <br />wa lk <br />curb, perin ft..................... ............ .........$.30 <br />grading, per cu. yd...............................#........ .75- <br />as nhalt pavement, using Aztec per sq. yd...................2.25 <br />Brick roadway pavement Type 1 for car tracks using <br />Ironstone repressed .or wire cut per sq. yd................ 2.70 <br />Using Standard or Streator wire out.... 0 .................. 2.72 <br />For Mortar cushion add per-sq. yd......................... .15 <br />Asphalt filler ,'a_d per sq. yd........................... .15 <br />Concrete stretcher block in car tracks per lin ft......... .20 <br />For 6" extra conduit under ties per sq. yd................ .90 <br />Asphaltic concrete using Aztec asphalt, er sq. yd...... 1.95 <br />8" conduit pipe, per lin ft............................... .80 <br />.Storm water inlets, each... ............................... 10.00 <br />Marginal curb, per liaft................................... .25 <br />Resetting inlets, each .................................... 2.00 <br />Resetting.manhA covers, each ............................. 2.00 <br />Bids mere received for a, pipe sewer improvement on Pleasant Street. <br />Bid of Staples & Ackerman. <br />12" nipe sewer, per lin ft.................................$1.90 <br />8" pipe sew3r, per lin ft................................ 60 <br />6" pipe sewer, per lin ft................................ .75 <br />Manholes, curbs and covers, each..... ... * ................ 15.00 <br />Uanholet per ft. in depth ................................ 5.00 <br />Bid received on pavement improvement on the lst. alley north of Washington Avenue. <br />Bid of H. N. Banner. <br />Grading, per cu. yd...................................... .77 <br />Concrete pavement, per sq. yd............................ 1.54 <br />Bid received and opened and read on Grading and curb irg of Portage Avenue. <br />Bid of H. N. Barnes. <br />Grading per cu. yd........................0............ $ .59 <br />Curbing, per lin. ft................................... .25 <br />Allot the a,b®vs bids were referred to the City Civil Engineer for <br />tabulation to be reported on at 7:45 P.U. this 7th. day of August 1917. <br />Communication received and read from E. A. Yung in regard to two poles <br />located on the north side of the first alley north of North Shore Drive. The same was <br />referred to the Pole and Wire inspector for investigation. <br />Building Commissioner C. A. Perkins e,ppeared before th- Board in regard <br />to hiring more inspectors for the Building Dept., also requested a leave of absence for <br />Mr. W. D. Teeple Assistant Building Commissioner for a short period of time -on account <br />of illness, the Same was granted. The Board instructed Mr. C. A. Perkins to secure <br />additional inspector for his department and ons for Mr. Tee��e's place tem-ora,rily. <br />T-h-e sal-avy th assistant inspector to be 490.00 per month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.