<br />Board met in regular session at 10:00 A.M. All members present.
<br />Bids were received opened and read. on Eddy Street & Misha��►aka Avenue
<br />Pavement improvement from Jefferson Blvd. to Centex of Nineteenth Street, under
<br />Improvement Resolution No. '544.
<br />Bid of the White Construct ion Company of Milwaukee, Wis.
<br />Walk per sq. ft................:...................1
<br />curb, per lin ft................................... .20
<br />grading per cu. yd................0................ .55
<br />Storm water inlets, complete..eaeh.................7.50
<br />8" conduit pipe, per lin ft........................ .60
<br />Resetting inlets, each .......... ................... 1#50
<br />Resetting covers, each....... .... .........1.50
<br />Asphalt pavement,; using Naa,tural Lake Asphalt, per .sq. yd... $2. 02
<br />Brick to pass s--)ec if icat ions per sq. yd.................... 2.17
<br />For Concrete stretcher along rails, per lin. ft............ .15
<br />For extra concrete between ties, per sq. yd................ .75
<br />Bid of the Federal Paving Company, of Hamilton, Ohio,
<br />Walk, per sq. ft................................ ...$.14
<br />curb, per lin ft..,.............................. .38
<br />cement, curb and gutter, per lin. ft................. .45
<br />grading per cu. yd.................................. .55
<br />For concrete stretcher along street car rails, per lin ft...$.18
<br />Extra 6 inches of concrete under ties of Street Car.
<br />wrack, per sq. yd..................................... $1.15
<br />Sheet asphalt, using Trinidad Pitch Lake Asphalt per sq. yd.82.38
<br />Sheet asphalt, using Mexican Oil Asphalt, per sq. yd....... $2.20
<br />Standard. , Terre Haute or Brazil Block , per sq. yd........ $3.25
<br />Sand Filler per sq. yd........................ $3.40
<br />Asphaltic concrete g avement, using Trinidad -Pitch Lake
<br />asphki,t, per sq. yd....................................... $2.16
<br />Using Mexican oil asphalt, per sq. yd............... ..... 2.00
<br />Storm water inlets, each .................................. 9.00
<br />8" conduit pipe, per lin ft ............................... .68
<br />Marginal curb, per lin ft................ ................ .25
<br />Resetting inlets, each....... 5.00
<br />Resetting manhole, covers, each ........................... 5.00
<br />pavement on
<br />Bids were received oniEddy Street from Mishawaka Avenue to Jefferson
<br />Blvd. under Improvement Resolution No. 539.- for
<br />Bid of Williston Construction Company, of Chicago, Ill.,
<br />curb, per lin ft... * ............ * ......... 0 .............$ .30
<br />grading, per cu. yd....................................... .75
<br />asphalt pavement, using Aztec asphalt, per sq. yd......... $ 2.25
<br />Brick roadway, type 1 for car tracks, using Ironstone
<br />repressed or wire cut per sq. yd.......................... 2.70
<br />Using Standard or Streator Wire Cut .....................
<br />Concrete Stretcher in car tracks, per lin ft..............
<br />Mortar Cushion add per sq. yd.............................
<br />Asphalt filler add. p:!r sq. yd............................
<br />6" extra, concrete under ties per sq. yd...................
<br />Aspaaltic concrete per sq. yd.............................
<br />all conduit per lin ft.....................................
<br />Stormwater inlets, each ... ..............................
<br />Marginal curb, per lin ft...................... ..........
<br />Resetting inlets, each ....................................
<br />Resetting manhole, covers, each ...........................
<br />2.72
<br />.20
<br />.15
<br />.15
<br />.90
<br />1.95
<br />.60
<br />10.00
<br />.25
<br />2.00
<br />2.00