My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:34:55 AM
Creation date
12/12/2018 1:17:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,.. 111 SIP.." - <br />0A S COUNV,. <br />embers of our team secured funding, worked on the design and <br />1W acquisition, and are providing inspection services for CR 4005,. <br />gether, all phases consist of 19,000 feet of roadway <br />;onstruction from an existing 2-lane section with shoulders to an <br />proved 2-lane section with curb -and -gutter (Phase 1) and 2-lane <br />:lion with improved shoulders, ditches, and updated clear zone <br />lases 2 - 4). <br />roughout the project, we ensured Cass County was well <br />ormed of the project status. Our team worked with adjacent <br />)perty owners, adding pipes and structures to reduce impacts on <br />ighboring farms. When changes occurred, we worked with the <br />unty and INDOT to minimize the overall impact to the schedule, <br />Iget, and funding. <br />an and her team successfully partnered with Cass County to: <br />Scope & design the corridor project <br />Provide extensive funding support <br />f" <br />Phase 1 <br />Phaa <br />Phase :3 <br />Phase <br />» Coordination with NS <br />» Partial ROW from <br />» Partial ROW from <br />» Partial ROW from <br />& Winamac Southern <br />11 parcels <br />6 parcels <br />15 parcels <br />Railroads <br />» Construction Cost: <br />» Estimated <br />» Estimated <br />» Partial ROW from 20 <br />$2,750,500 (2018) <br />Construction Cost: <br />Construction Cose <br />parcels <br />$3,300,000 (2019) <br />$2,700,000 (2020) <br />» Construction Cost: <br />$1,758,000 (2017) <br />Lochmueller is currently providing construction inspection <br />services for 12 acres in Howard Park. <br />IMPROVEMENTS INCLUDE <br />UDE <br />» 14,300 SF, 1-story community center <br />» 4,300 SF, 1-story support facility <br />» Outdoor ice skating pond/trail <br />» Outdoor playground <br />» Interactive water fountain <br />» Riverfront trail improvements including event lawn with trai <br />lighted connections to St. Louis Boulevard <br />» New curb, sidewalk, HMA pavement, watermain, storm sew <br />and lighting on St. Louis Boulevard <br />
The URL can be used to link to this page
Your browser does not support the video tag.