Laserfiche WebLink
DALE WILLS <br />RESIDENT PROJECT REPRESENTA TII/ <br />BS, Civil Engineering, Purdue University, 1982 1 INDOT PE/S I INDOT Final Construction Record <br />INDOT SiteManager I INDOT Certified Technician I INDOT Stormwater Inspection Manager <br />Dale leads our Transportation Team's construction inspection services in the South Bend <br />office. He performs and coordinates all aspects of field inspection for LPA and INDOT <br />projects. He has over 35 years of experience estimating, scheduling, managing, surveying, <br />and inspecting construction projects related to water, wastewater, stormwater drainage, <br />buildings, dams, and transportation projects. Dale has successfully turned in 14 final <br />records on -time in the last 7 years. <br />Dale's experience also includes the contractor side of actually planning, estimating, <br />bidding, and implementing a project. This experience has been valuable in reconciling <br />disputes and addressing discrepancies in the plans and specifications before construction <br />rather than after the fact. He has been involved with numerous federal aid and LPA <br />projects in both design assistance and construction inspection since 1982. <br />Cleveland Road Reconstruction - St. Joseph County <br />» RPR for the roadway reconstruction of the 4-lane section from Riverside Drive to SR 933. This project consists of a total <br />reconstruction of 5,500 feet of roadway, including replacement of the deteriorated concrete pavement and curb, addition of a multi- <br />use path, & a pedestrian -activated crossing signal and lighting, please see page 7 for more information <br />» Construction Cost: $8,287,000 (Federal -Aid LPA) (2019) <br />Two -Way Street Conversion - City of South en <br />» Project Inspector for this 4-mile project that included asphalt paving, three new roundabouts <br />equipped with pedestrian -friendly crossways & flashing lights, 28 traffic signal upgrades, <br />installation of 120 street lights, drainage improvements including new structures & pipe <br />installation, new concrete curbs & sidewalks, & landscaping, please see page 7 for more <br />information <br />» Construction Cost: $20 million (2016) <br />Gurnwood RoadReconstruction, Phases I & II - St. Joseph County <br />» RPR for 2-mile-long LPA project that included construction of added travel lanes, asphalt <br />pavement & curb -and -gutter, please see page 8 for more information <br />» Construction Cost: $7.6 million (2016) <br />CIR 400S, Phase J. - Cass County <br />Project Inspector for the road reconstruction from SR 25 to 500 feet east of CR 400 West, <br />please see page 9 for more information <br />» Construction Cost: $1.8 million (2017) <br />CR 300 S for Cass County, Indiana <br />Project Inspector for road re -alignment & intersection <br />improvements for this industrial corridor roadway, please <br />see page 8 for more information <br />» Construction Cost: $1.6 million (2011) <br />CLIENT REFERENCES FOR DALE <br />Jessica Clark I St. Joseph County 1574.235.9626 <br />Andrew Hayes I St. Joseph County 1574.235.9626 <br />Rick Gaul I City of Plymouth 1 574.936.3614 <br />Jeff Smith I Cass County 1 574.753.3749 <br />Duane Alverson I Lake County 1219.663.0525 <br />