My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Quotations/Proposals
>
Opening of Proposals - Bendix Dr, Lathrop to Indiana Toll Road Project No 114-065 - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 8:34:55 AM
Creation date
12/12/2018 1:17:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/11/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r rra%iro/ � RESIDENT T PROJECT REPRESENTATIVE <br />AS, Applied Science Architectural Engineering, ITT Fort Wayne, 1991 INDOT PE/S INDOT <br />SiteManager I INDOT Certified Technician I INDOT Stormwater Inspection Manager <br />Myron serves as a Chief Inspector on projects in Northern Indiana. His responsibilities <br />include construction inspection, soils and concrete testing, project documentation, and <br />completing final construction records utilizing INDOT SiteManager. <br />Myron has 27 years of experience working on numerous INDOT and federal -aid LPA <br />construction projects involving road reconstruction, new roadway construction, <br />resurfacing projects, new bridge construction, bridge replacements, bridge rehabilitations, <br />small structures, drainage projects, storm sewer/sanitary installations, water lines, and <br />trail installations. <br />Prior to joining Lochmueller, Myron was employed by INDOT's LaPorte District for 17 <br />years. <br />REPRESENTATIVE INSPECTION X I <br />Howard Park Redevelopment - Cityof South Bend <br />» RPR for the redevelopment of 12 acres in Howard Park, please see page 9 for more <br />information <br />» Construction Cost: $18.8 million (2016) <br />Two-WayTwo-Way Street Conversion - City of South Bend <br />» Project Supervisor for this 4-mile project, please see page 7 for more information <br />» Construction Cost: $20 million (2016) <br />East Bank Sewere ara °Phase IV - City of South Bend <br />» Project Supervisor for a sewer separation & road rehabilitation project that included 2.5 <br />miles of pipe work & road work <br />» Construction Cost: $2,616,070 (2013) <br />CR 400S, Phase 1 & 2 - Cass County <br />» Project Supervisor for the road reconstruction from SR 25 to 1000 feet east of CR 300 West, <br />please see page 9 for more information <br />» Construction Cost: $1.8 million (Phase 1- 2017) & $2.7 million (Phase 2 - 2018) <br />US 1 Kokomo By-pass, Howard County - INDOT, Greenfield District <br />» Project Supervisor for new road & bridge construction that included 3 miles of concrete pavement, US 35 & US 31 interchange, 10 <br />bridges, & 2.0 miles of US 35 reconstructed <br />» Construction Cost: $39 million <br />US 31 & 7ch Road Interchanges Marshall County - INDOT, LaPorte <br />District <br />» Project Supervisor for new pavement & bridge installation <br />that included 3 miles of concrete pavement & 520,000 cy of <br />earth work <br />» Construction Cost: $9.9 million <br />CLIENT REFERENCES FOR MYRON14 <br />Jeff Smith I Cass County 1 574.753.3749 <br />Don Leonard I INDOT LaPorte District 1219.851.2140 <br />Rick Furnish 1 INDOT Fort Wayne 1 260.205.3183 <br />Mike Koch 1 INDOT Fort Wayne 1260.969.8253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.