Laserfiche WebLink
REGULAR MEETING <br />QUOTATION: <br />Base Bid <br />$150,095.00 <br />Alternate 1 <br />($4,668.00) <br />Alternate 2 <br />$14,023.00 <br />Total Base Bid and Alternates 1 and 2 <br />$159,450.00 <br />MAY 29, 2012 181 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Roos and carried, the above quotation was <br />referred to Engineering for review and recommendation. <br />AWARD QUOTATION — EMERGENCY SEWER REPAIR --- WASHINGTON STREET — <br />(SEWER OPERATIONS /MAINTENANCE) <br />Mr. John Pemberton, Sr., Sewer Department, advised the Board that on May 16, 2012, HRP <br />Construction was requested to provide an emergency sewer repair for the a line break on <br />Washington Street. The emergency was due to a threat to public safety from a broken sewer line. <br />Mr. Pemberton is now requesting the Board approve the award of this emergency sewer repair to <br />HRP Construction, 24358 State Road 23, South Bend, Indiana 46614, in the amount of <br />$28,960,00. Therefore, Mr. Gilot made a motion that the recommendation be accepted and the <br />emergency quotation be awarded as outlined above. Ms. Roos seconded the motion, which <br />carried. <br />TABLE /APPROVE CHANGE ORDER NO. 1 — ACS/VA PROJECT SITE IMPROVEMENTS <br />—PROJECT NO. 112 -009 (SBCDA TIF) <br />Mr. Gilot advised that Mr. Bill Schalliol, Community and Economic Development, has <br />submitted Change Order No. I on behalf of C &E Excavating, Inc., 53767 County Road 9, <br />Elkhart, Indiana 46514, indicating the contract amount for this project be increased by <br />$35,567.35 for a modified contract sum, including this Change Order, in the amount of <br />$312,727.35. Mr. Gilot made a motion to table the Change Order until Mr. Schalliol returned to <br />the meeting and could explain what this work was for. Upon a motion made by Mr. Gilot, <br />seconded by Ms. Roos and carried, the Change Order was tabled. <br />Mr. Schalliol returned to the meeting and explained the original curb and sidewalk were <br />estimated too low, and an increase was needed to extend the walk to complete the project. He <br />stated a huge tank was uncovered; what was thought to be 5,000 gallons turned out to be 15,000 <br />gallons. And finally there were changes to the lighting of the parking lot that needed to be <br />accommodated. Mr. Gilot stated two (2) of those changes were discretionary, one (1) was <br />unforeseen circumstances. He noted discretionary changes must be reviewed carefully. Upon a <br />motion by Ms. Roos, seconded by Mr. Neal and carried, Change Order No. 1 was approved as <br />outlined above. <br />APPROVE CHANGE ORDER NO. 3 — IGNITION PARK PHASE IA -• PROJECT NO. 111- <br />073 (AEDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 3 on behalf <br />of Selge Construction Company, Inc., 2833 South I Vh Street, Niles, Michigan 49120, indicating <br />the contract amount be decreased by $19,127.50 for a modified contract sum, including this <br />Change Order, in the amount of $2,345,906.72. Upon a motion made by Mr. Gilot, seconded by <br />Ms. Roos and carried, the Change Order was approved. <br />TABLE CHANGE ORDER NO. I — INSTALLATION OF 45 -KW HYDROELECTRIC <br />TURBINE —PROJECT NO. 111 -010 EECBG <br />Mr. Gilot advised that Mr. Jonathon Burke, Energy Office, has submitted Change Order No. I on <br />behalf of Koontz- Wagner Construction Services, LLC, 3801 Voorde Drive, South Bend, Indiana <br />46628, indicating the contract amount be increased by $65,497.36 for a modified contract sum, <br />including this Change Order, in the amount of $182,614.36. Mr. Gilot stated Mr. Burke has <br />requested the Board table this request until further review. Upon a motion made by Mr. Gilot, <br />seconded by Ms. Roos and carried, the Change Order was tabled. <br />APPROVE CHANGE ORDER NO. 4 FINAL AND PROJECT COMPLETION AFFIDAVIT <br />— DIAMOND AVENUE TRUNK STORM SEWER — PROJECT NO. 109 -033 2010 SEWER <br />BOND) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 4 (Final) on <br />behalf of Rieth -Riley Construction Co., Inc., 25200 SR 23, PO Box 1775, South Bend, Indiana <br />46634 indicating the contract amount be increased by $10,431.37 for a modified contract sum, <br />