My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/29/12 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2012
>
05/29/12 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 4:15:07 PM
Creation date
6/13/2012 11:27:12 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/21/2002
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING MAY 29,,.2012 180 <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri- <br />County News, which were found to be sufficient. In a Memo to the Board, Mr. Bill Schalliol, <br />Community and Economic Development, requested that all bids received be rejected and <br />returned to the bidders unopened. Mr. Schalliol further requested to re- advertise for bids for this <br />project at a later date. In his memo, Mr. Schalliol explained that the potential for delays with <br />utility relocations and property acquisition would have added time and expense to the project. He <br />noted that having the project last through two (2) construction seasons, 2012 and 2013, as <br />opposed to having the project set for one season, will likely save costs and create better positive <br />will with the business community on the south side of town. Upon a motion made by Mr. Gilot, <br />seconded by Ms. Roos and carried, the above bids were rejected and the request to re- advertise <br />for bids was approved. <br />OPENING AND AWARD OF QUOTATION — APPROVAL OF CONTRACT — CURB AND <br />SIDEWALK PROGRAM TREE REMOVAL - PROJECT NO. 112 -024A OTHER SERVICES <br />AND CHARGES /STREET MAINTENANCE) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed Quotations for <br />the above referenced project. The following Quotation was opened and read: <br />KC TREE INC. <br />1320 Third Street <br />Osceola, Indiana 46561 <br />Quotation was submitted by Mr. Kregg Keigley <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non - Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was Submitted <br />QUOTATION: <br />Item <br />Description <br />Unit <br />Unit Price <br />1. <br />0 -15" Diameter <br />Each <br />$375.00 <br />2. <br />16 -24" Diameter <br />Each <br />$700.00 <br />3. <br />25 -36" Diameter <br />Each <br />$900.00 <br />4. 1 <br />37" + Diameter <br />Each <br />$1,200.00 <br />Upon a motion made by Mr. Gilot, seconded by Ms. Roos and carried, the above Quotation was <br />referred to Engineering for review and recommendation and confirmation that the bidder is a <br />licensed arborist in Indiana. After reviewing the bid, Mr. Toy Villa, Engineering, recommended <br />that the Board award the contract to the sole responsive and responsible bidder KC Tree, Inc., in <br />unit prices as stated above, not to exceed $75,000.00. In his Memo, Mr. Villa stated he <br />confirmed that KC Tree, Inc. was a licensed arborist in Indiana. Therefore, Ms. Roos made a <br />motion that the recommendation be accepted and the bid be awarded and the contract approved <br />as outlined above. Mr. Neal seconded the motion, which carried. <br />OPENING OF HELD LTOTATION — EAST RACE WATERWAY DOCK EXTENSION -- <br />PROJECT NO. 11 I -074 EDIT <br />Mr. Gilot advised that quotes for this project were due and received on May 15, 2012. The Board <br />voted to hold the one quote received until their next meeting due to nobody being present that <br />was working on this project and the item not being submitted for the agenda. The following <br />Quotation was opened and read: <br />THE ROBERT HENRY CORPORATION <br />404 South Frances Street <br />South Bend, Indiana 46614 <br />Quotation was submitted by Mr. Stephen Henry <br />Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment Eligibility <br />Verification, Non- Discrimination Commitment for Contractors and Certification of Use <br />of United States Steel Products or Foundry Products was submitted <br />Local Business Preference Claim Form was submitted <br />
The URL can be used to link to this page
Your browser does not support the video tag.