ALTERNATE #9 — ASBESTOS AND OTHER ABATEMENT — MAIN FLOOR <br />NOTE: On February 1, 2012, JC Schrock told Bill Schalliol that DJ was including this part <br />of the abatement in our contract with GMS & ACS. That was true at the time, but as a <br />part of the change order for the larger floor plan, that the VA has now decided against <br />implementing. Per the original proposal, DJ was not responsible for handling or <br />removing hazardous materials. After receiving the authorization from ACS (via the VA) <br />DJ solicited a proposal from Diamond Environmental Services, which is the basis for the <br />abatement alternates. The main floor abatement is required for the VA project and is <br />currently underway. <br />All abatement work to be performed by Diamond Environmental Services: <br />• Removal of approximately 1,317 Lin. Ft. of asbestos pipe insulation in front offices, <br />east bay area. <br />• Removal of approximately 97 Sq. Ft. of Transite board material in back offices under <br />windows. <br />• IDEM State Notification fees. <br />• Provide scissor lifts as needed. <br />• Disposal fees. <br />• OSHA required air monitoring. <br />• Standard Insurance Certificate. <br />• Final Air Clearances. <br />Alternate #9 Add: $17,750.00 <br />ALTERNATE #10 — ASBESTOS AND OTHER ABATEMENT — SECOND FLOOR <br />All abatement work to be performed by Diamond Environmental Services: <br />• Removal of approximately 815 Lin. Ft. of asbestos pipe insulation throughout the <br />second floor. <br />• Disposal fees. <br />• OSHA required air monitoring. <br />• Standard Insurance Certificate. <br />• Final Air Clearances. <br />Alternate #10 Add: $8,900.00 <br />ALTERNATE #11— ASBESTOS AND OTHER ABATEMENT — BOILER ROOM <br />All abatement work to be performed by Diamond Environmental Services: <br />• Removal of approximately 815 Lin. Ft. of asbestos pipe insulation in boiler room. <br />• Removal of boiler insulation. (Original boiler) <br />• Clean entire floor from ACM debris. <br />• Disposal fees. <br />• OSHA required air monitoring. <br />• Standard Insurance Certificate. <br />• Final Air Clearances. <br />Alternate #11 Add: $10,850.00 <br />DJ Construction Co., Inc. City of South Bend & ACS — VA Clinic — Gates Building 5/3/2012 Page 5 <br />