Laserfiche WebLink
ALTERNATE #5 — FILL IN SECOND LEVEL WINDOWS AT ALLEY WITH SMOOTH BLOCK <br />This is at the alley and may be required to meet code depending on local inspector. <br />• Remove existing glazing and window frames from nine openings along the alley and <br />dispose of off site. Note: Earlier price for this item was based on only eight <br />openings. <br />• Provide and install 8" smooth face concrete masonry units. <br />• Price now includes tenting of area and temporary heat for winter construction. <br />• Paint new concrete block masonry units to match existing walls. Provide one (1) <br />coat of block filler and one (1) coat of latex exterior paint. (This section of building <br />will get another coat of paint in Alternate #8. <br />Alternate #5 Add: $18,890.00 <br />ALTERNATE #6 — FILL IN SECOND LEVEL WINDOWS WITH METAL <br />This is for JUST the South and West walls of the original building AND the south two <br />windows along the East wall most visible from Western Avenue. We will not put metal <br />and trim on the remaining windows along the alley which are behind the power lines. <br />• Existing glazing and window frames to remain in place at typical openings except at <br />the alley where they will be removed so that those two openings can be filled with <br />smooth concrete masonry units. <br />• Provide and install horizontal channels attached to either the existing vertical <br />mullions or the new smooth concrete masonry units (along the alley only). <br />• Provide and install treated 2x6 trim piece attached to the face of the existing brick at <br />window openings that do not already have a stucco trim border. <br />• Provide and install trim metal (in color selected by City and ACS) to wrap the 2x6 or <br />stucco border at each window opening. <br />• Provide and install new metal siding (in color selected by City and ACS) fastened to <br />the channels to fill in the window openings. <br />Alternate #6 Add: $32,500.00 <br />ALTERNATE #7 — NOT USED <br />ALTERNATE #8 — PAINT THREE SIDES OF VA CLINIC PORTION OF BUILDING <br />This is for the East (adjacent to the alley), South and West (as far North as the original <br />building goes) walls of the building. <br />• Power wash building walls. <br />• Provide two (2) coats of latex exterior paint. <br />Alternate #8 Add: $25,060.00 <br />DJ Construction Co., Inc. City of South Bend & ACS — VA Clinic — Gates Building 5/3/2012 Page 4 <br />