Laserfiche WebLink
Change Order No.1 <br />Howard Park Redevelopment <br />Project No. 117-047-B <br />37. Remove Two Levels Tiered Seat -wall at Water Fountain — See <br />Sheets LIS, Detail 5, L3.7, Detail 1 attached ...Deduct Deduct $24,500.00 <br />Twenty -Four Thousand Five Hundred Dollars ($24,500.00) <br />from the Contract Amount. <br />38. Replace "Serpentine" Seat -Wall with Retaining Wall — See Deduct $26,130.00 <br />Sheets L3.8, Detail 3/1-3.8 Enlarged Plan — Seatwall "G" <br />attached; Delete reference to "Optional Wood Back"...Deduct <br />Twenty -Six Thousand One Hundred -Thirty Dollars <br />($26,130.00) from the Contract Amount. <br />39. Color Mix Clarification for Poured -in -Place Surfacing Deduct $23,836.00 <br />(Reference Specification Section 32 18 16 Playground <br />Protective Surfacing, Part 2, Products 2.1 Unitary Synthetic <br />Duel -Density Seamless Surface) ...Deduct Twenty -Three <br />Thousand Eight Hundred Thirty-six Dollars ($23,836.00) from <br />the Contract Amount. <br />40. Delete Welded Wire Fabric in 5" and 8" Concrete Sidewalks Deduct $31,500.00 <br />from Surface and under Poured Play Surfaces from the scope <br />of work (Welded Wire Fabric and Fibermesh Reinforcement <br />to remain in Skate Trail — See Sheet L3.0, Details 1-4, L3.1, <br />Details 7,8 attached ...Deduct Thirty-one Thousand Five <br />Hundred Dollars ($31,500.00) from the Contract Amount. <br />41. Delete Welded Wire Fabric in 5" Concrete Walk Under Brick Deduct $4,200.00 <br />Pavers — See Sheets L3.0, Details 4, 9 and 11/A3.0, and L3.1, <br />Detail 1/A3.1 attached ...Deduct Four Thousand Two Hundred <br />Dollars ($4,200.00) from the Contract Amount. <br />42. Delete 8" Thick Concrete Bands (No Color) at Walks and Deduct $31,000.00 <br />Continue 5" Thick Concrete Walks with Tooled Banding <br />(Reference Enlarged Layout Plans Sheets L1.2, L1.3 and L1.4, <br />Details 9-11/1-3.0) ...Deduct Thirty -One Thousand Dollars <br />($31,000.00) from the Contract Amount. <br />43. Change 15 Structures to 5' deep, not 12' Deep — East and <br />North of Rink; Delete Structure 37 — See Sheets C6.1, C6.2, Deduct $40,000.00 <br />C6.3, C6.4, C6.5, C6.6, C6.7 attached... Deduct Forty Thousand <br />Dollars ($40,000.00) from the Contract Amount. <br />SHEET 8 OF 10 <br />