Laserfiche WebLink
Change Order No.1 <br />Howard Park Redevelopment <br />Project No. 117-047-B <br />RIVERFRONT TRAIL IMPROVEMENTS <br />1. Adjust Grades by Reducing Amount of Fill at South Park — <br />3,200 CY @ 18.25 / CY — See Sheets C5.1 and CS.2 attached <br />...Deduct Fifty -Eight Thousand Four Hundred Dollars <br />($58,400) from the Contract Amount. <br />2. Reduce 50% of 5" Caliper Trees to 3" Caliper Trees —See <br />Sheets L2.1, L2.4, L2.5 attached. Delete all references to <br />Hydro -Seed (ie. not included in CO No.1)... Deduct Nine <br />Thousand Dollars ($9,000.00) from the Contract Amount. <br />3. Remove Rebar and Alter Size of Out -Cropping Stones — See <br />Sheet L3.2 , Out -Cropping Stone Details 2, 4 attached <br />...Deduct Fifteen Thousand Dollars ($15,000.00) from the <br />Contract Amount. <br />4. Change 8" Thick Concrete Slab to 5" Thick Concrete Slab <br />around North and East Sections of Event Lawn Oval <br />(approximately 9,600SF) where Heavy Vehicular Traffic is not <br />expected — See Sheet L1.1, L1.4, Detail 2/L3.0 <br />attached... Deduct Eight Thousand Four Hundred Fifty Dollars <br />($8,450.00) from the Contract Amount. <br />SHEET 9 OF 10 <br />Deduct $58,400.00 <br />Deduct $9,000.00 <br />Deduct $15,000.00 <br />Deduct $8,450.00 <br />