Laserfiche WebLink
Change Order No.1 <br />Howard Park Redevelopment <br />Project No. 117-047-B <br />30. All panel board feeders 100 amp and larger shall be <br />aluminum in lieu of copper — See Sheet E0.1 attached <br />...Deduct Twenty -One Thousand Dollars ($21,000.00) from <br />the Contract Amount. <br />31. Change panel and switch gear bussing from copper to <br />aluminum. Contractor is to be responsible for coordinating <br />and meeting any manufacturer's installation requirements due <br />to the use of dissimilar metals ...Deduct Nine Thousand <br />Dollars ($9,000.00) from the Contract Amount. <br />33. Branch circuit wiring may be run with MC Cable in lieu of <br />conventional conduit and wire where practical and allowed by <br />NEC. EMT or other appropriate rigid conduit type will still be <br />used from panel to the first junction box before branching off <br />with MC Cable. All feeds 40 amp and above will remain as EMT <br />or other appropriate rigid conduit type (as required for the <br />specific application). (Applies to all electrical drawings). MC <br />cable allowed for interior use only and must be installed and <br />supported per NEC requirements. ...Deduct Fourteen <br />Thousand Dollars ($14,000.00) from the Contract Amount. <br />34. Change Wireless MIC System from Shure ULXD to Shure <br />QLXD (Reference Drawings Sheet E0.5 Cafe and Patio DSP., <br />Amps and Speakers) ... Deduct Seven Thousand Six Hundred <br />Eighty Dollars (7,680.00) from the Contract Amount. <br />35. Delete Speaker System in Cafe (Rough -in to remain part of <br />Contract) ...Deduct One Thousand Forty Dollars ($1,040.00) <br />from the Contract Amount. <br />36. Replace CU Structural Soil with City Standard Tree Planting <br />Soil Mix — Reconfigure Limits — See Sheets L2.9, L2.10, and <br />L3.3, Details 1-3/1-3.3 attached (Reference Specification <br />Section 3123 18.13 Soil, Fill, Backfill, CU Structural Soil, and <br />Debris Removal; Specification Section 3123 23 Acceptance of <br />Backfill, Topsoil, CU Structural Soil; and, 32 93 11 Plantings — <br />Replace language for Tree Pits with Planter Soil) ...Deduct <br />Eighty Thousand Dollars ($80,000.00) from the Contact. <br />SHEET 7 OF 10 <br />Deduct $21,000.00 <br />Deduct S9,000.00 <br />Deduct $14,000.00 <br />Deduct $7,680.00 <br />Deduct $1,040.00 <br />Deduct $80,000.00 <br />