Laserfiche WebLink
~~ <br />v, <br />REGULAR MEETING JANUARY 28, 2008 <br />AWARD QUOTATION - PRINTER/COPIER FOR BILLING (WATER WORKS CAPITALI <br />Ms. Nancy Yarbrough, Water Works, advised the Board that on January 14, 2008 quotations <br />were received and opened for the above referred to project. After reviewing those quotations, <br />Ms. Yarbrough recommends that the Board award the quote to the lowest responsive and <br />responsible bidder, U.S. Business Systems, Inc., 3221 Southview Drive, Elkhart, Indiana, in the <br />amount of $4,658.00 plus maintenance. Therefore, Mr. Gilot made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Mr. Littrell <br />seconded the motion, which carried. <br />AWARD QUOTATION -INSERTER FOR BILLING (WATER WORKS CAPITAL) <br />Ms. Nancy Yarbrough, Water Works, advised the Board that on January 14, 2008 quotations <br />were received and opened for the above referred to project. After reviewing those quotations, <br />Ms. Yarbrough recommends that the Board award the quote to the lowest responsive and <br />responsible bidder, U.S. Business Systems, Inc. 3221 Southview Drive, Elkhart, Indiana, in the <br />amount of $29,120.00. Therefore, Mr. Inks made a motion that the recommendation be accepted <br />and the quotation be awarded as outlined above. Mr. Littrell seconded the motion, which <br />carried. <br />AWARD OUOTATION -PROCUREMENT OF PRINTED MATERIALS -PROJECT NO. <br />108-008 (WATER WORKS GENERAL FUND) <br />Ms. Nancy Yarbrough, Water Works, advised the Board that on January 14, 2008 quotations <br />were received and opened for the above referred to project. After reviewing those quotations, <br />Ms. Yarbrough recommends that the Board award the quote to the lowest responsive and <br />responsible bidder, Corporate Graphic Solutions, 28417 Glenview Drive, Elkhart, Indiana, in the <br />amount of $41,815.02, plus $90.00 per month for delivery. Therefore, Mr. Inks made a motion <br />that the recommendation be accepted and the quotation be awarded as outlined above. Mr. <br />Littrell seconded the motion, which carried. <br />APPROVE CHANGE ORDER -PORTAGE AVENUE RECONSTRUCTION -PROJECT <br />NO. 98-74 (LRSA) <br />Mr. Gilot advised that Mr. Carl Littrell, Engineering, has submitted Change Order Nos. 1-10 on <br />behalf of Rieth-Riley Construction Co., Inc., 25200 State Road 23, Post Office Box 1775, South <br />Bend, Indiana 46614, indicating the following changes: <br />1 <br /> Original Contract Amount: $5,297,264.00 <br />Chance <br />Amount of Percent <br />New Contract <br />Order Description Change of Amount <br />No. Change <br />1 Change Service Connection to 20" $12,625.00 0.24% <br /> Water Main to Cut-In Connection <br /> $5,309,889.00 <br />2 Provide Light Poles Omitted from $199,408.00 3.76% <br /> Proposal <br />$5,509,297.00 <br />3 Credit for Avoided Service Connection, -0.58% <br /> C.O. #1 ($31,800.00) $5,477,497.00 <br />4 Vault for Latent 4" Water Service $8,763.00 0.16% $5,486,260.00 <br />5 Pipe to Relocate 4" Service $3,760.25 0.07% $5,490,020.25 <br />6 Wet Ta to Re-Connect 4" Service $4,433.00 0.08% $5,494,453.25 <br />7 Relocate 36" Storm Sewer to Resolve 0.08% <br /> Conflict $4,355.00 $5,498,808.25 <br />8 Pipe Anchor Omitted from Proposal $2,913.00 0.05% $5,501,721.25 <br />9 Manual Swing Traffic Barrier Omitted 0.12% <br /> from Proposal $6,802.50 $5,508,523.75 <br />10 Electric Service for Signal Controller 0.01 <br /> Omitted from Proposal $770.00 $5,509,293.75 <br />Totals $212,029:75 4.00% <br />New Contract Amount: $5,509;293.75 <br />Upon a motion made by Gilot, seconded by Mr. Littrell and carried, the Change Orders 1-10 <br />were approved. <br />