My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/13/12 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2012
>
03/13/12 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2015 4:11:05 PM
Creation date
3/28/2012 9:59:34 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/13/2012
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING <br />MARCH 13, 2012 79 <br />ALTERNATE - Additional Cost to Install Sod <br />in lieu of Hydroseed <br />$1,490 /SYD <br />$6.25 <br />$9,312.50 <br />Total Base bid Plus Alternate <br />$265,240.00 <br />Contingent Items <br />C -1: Provide and Install New 1000 W MH Lamp <br />$100.00 <br />C -2: Provide and Install New 1000 W Ballast <br />$175.00 <br />C:3: Provide and Install New Luminaire <br />$745.00 <br />WALSH & KELLY, INC. - <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Dustin Hillary <br />1. Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment <br />Eligibility Verification, Non- Discrimination Commitment for Contractors and <br />Certification of Use of United States Steel Products or Foundry Products was <br />Submitted <br />2. Five percent (5 %) Bid Bond was submitted <br />3. Indiana Local Business Preference Claim form was submitted <br />:W <br />Base Bid <br />$259,176.69 <br />`Base Bid Price Corrected to $259,176.39 <br />Description <br />Quantity /Unit <br />Unit Price <br />Total Amount <br />ALTERNATE - Additional Cost to Install Sod <br />in lieu of Hydroseed <br />$1,490 /SYD <br />$6.00 <br />$8,940.00 <br />Total Base bid Plus Alternate <br />$268,116.69 <br />Contingent Items <br />C -1: Provide and Install New 1000 W MH Lamp <br />$400.00 <br />C -2: Provide and Install New 1000 W Ballast <br />$500.00 <br />C:3: Provide and Install New Luminaire <br />$1,000.00 <br />JOHN BOETTCHER SEWER & EXCAVATING <br />3305 North Home Street <br />Mishawaka, Indiana 46545 <br />Bid was signed by: Mr. John Boettcher <br />1. Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment <br />Eligibility Verification, Non- Discrimination Commitment for Contractors and <br />Certification of Use of United States Steel Products or Foundry Products was <br />Submitted <br />2. Five percent (5 %) Bid Bond was submitted <br />:f <br />Base Bid <br />$290,874.14 <br />Description <br />Quantity /Unit <br />Unit Price <br />Total Amount <br />ALTERNATE - Additional Cost to Install Sod <br />in lieu of Hydroseed <br />$1,490 /SYD <br />$6.28 <br />$9,357.20 <br />Total Base bid Plus Alternate <br />$300,231.34 <br />Contingent Items <br />C -1: Provide and Install New 1000 W MH Lamp <br />$65.15 <br />C -2: Provide and Install New 1000 W Ballast <br />$190.55 <br />C:3: Provide and Install New Luminaire <br />$952.75 <br />RIETH -RILEY CONSTRUCTION CO., INC. <br />25200 State Road 23 <br />Post Office Box 1775 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Todd Gose <br />1. Contractor's Non - Collusion Affidavit, Non - Debarment Affidavit, Employment <br />Eligibility Verification, Non - Discrimination Commitment for Contractors and <br />
The URL can be used to link to this page
Your browser does not support the video tag.