My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/29/1916 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1916
>
08/29/1916 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 12:50:49 PM
Creation date
11/6/2018 11:20:07 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
8/29/1916
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The following letter, was rec&ided read and placed on file. <br />Board of Public Works <br />South Bend, Indiana. <br />Gentlemen: - <br />I am sending you under separate cover sketch showing location of gas mains <br />services and stubs on Michigan Street between La Salle Street and South Street. <br />We expect to have all the work done south of Jefferson Blvd, by Tuesday <br />night of next week. We will rush the work between Jefferson Blvd. and La Salle Ave. <br />and can assure you we will get our work done and keep out of the way of the, paving <br />contractor. <br />We expected to get our part of the work done long ago but have been held <br />up by the contractor installing steam lines wid by the scarity of labor. Further in <br />order to protect ourselves against leaks it is necessary for us to complete our work, <br />last, Any little settlement or damage to our pipes will cause leaks which will <br />cause trouble ifto matter how small. A gas leak will not take up like a water leak and <br />is mush more `seriour than a steam leak. Any settlement in our mains will cause traps <br />which gradually fill up with condemnsation and finally shut off the flow of gas. <br />We are trying to do our work in such manner as to absolutely prevent any, <br />trouble for a good• many years to come. Mr. Andersoh ha's been on our heels continually <br />and we have promised him to complete our work so as not to interfere'with the paving <br />and I can assure you we will keep our promise. <br />Yours very truly, <br />Manager. <br />City Engineer reported on the condition of Leeper Avenue Pavement <br />at corner of Howard Street in regard to A. G. Mattes momplaint about the same. <br />And the same was read and placed on file. <br />Engineer reported that the bump in pavement on Indiana Ave. has been <br />repaired. <br />Street Oemmissioner reported sidewalk defective on Walnut Street at <br />corner of Washington Avenue and the same belongs to J. Seeberger. The Board ordered <br />that a thirty(30) day notice be sent to repair or construct a new walk. <br />Street Commissioner made report that walk at 502 E. La Salle Avenue <br />is sunken down and holds water and should be mired at once. Wrr.. N. Bergan owner <br />was ordered notified to repair or construct a sidewalk hitt',bove number within thirty <br />(30) days. <br />Permissinn granted the'Central Union Tel. Company to set poles and <br />✓ anchors on various streets in she City. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.