My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Three Twenty at the Cascade Glazed Assemblies Project No 118-074A - Precision Wall Systems Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Opening of Bids
>
Opening of Bids - Three Twenty at the Cascade Glazed Assemblies Project No 118-074A - Precision Wall Systems Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/10/2025 1:20:29 PM
Creation date
10/25/2018 9:17:51 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/23/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(8) consecutive hours exclusive of one-half (112) hour lunch period that shall be at approximately at <br />mid point of shift. For the purpose of shiftwork, a day is defined as, a 24 hour period commencing <br />with the established starting time of the day shift. Starting time of the work day maybe changed within <br />these hours by the employer to take advantage of daylight hours, weather conditions, or shift or traffic <br />conditions. <br />Section 2. With mutual consent between the Union and the Employer, the regular work day may <br />consist of ten (10) hours labor on the job and the regular weekly work schedule may consist of four (4) <br />ten (10) hour days on consecutive days. The Employer will notify the Union prior to implementing a <br />four (4) ten (10) schedule. <br />Section 3. With mutual consent between the Union and the Employer; then in the discretion of the <br />Employer, a Voluntary make-up day may be scheduled for work missed due to holidays or inclement <br />weather. In declining of voluntary make-up day, the employee shall not be penalized or discriminated <br />against. The make-up day shall be paid at the regular hourly rate of pay, unless work is performed on <br />Sunday or unless the work missed was scheduled to be performed on overtime. <br />Section 4. Employees shall be at the shop or project site and prepared to work at the scheduled starting <br />time each day and shall remain until quitting time. <br />Section 5. All work outside the regular work day and all work in excess of forty (40) hours in the work <br />week shall be paid at one and one-half (1 "2) times the regular rate. Any shift that exceeds more than <br />12 hours will be paid at double (2) time rate. <br />Section 6. For any shift which starts prior to 6:00 A.M. or after 12:00 P.M., the Employer shall pay all <br />employees a shift differential of $2.00 per hour above the applicable wage scale. All shifts shall be <br />scheduled for at least eight (8) consecutive hours. <br />Section 7. All work on Sunday shall be paid at two (2) times the regular rate. <br />Section 8. There shall be no pyrainiding of overtime payments required by this Article. <br />ARTICLE XVH <br />Breaks and Clean -Up Time <br />Section 1. Breaks, The following rules shall apply to employee breaks during regular and extended <br />shift hours: <br />a. A non -organized 15 minute break shall be allowed at the approximate midpoint of the pre - <br />lunch work time on each shift. This break is to be taken at the assigned place of work. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.