My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Professional Services Agreement - DLZ Indiana LLC - Prep and Assistance with Fat Daddy's Demolition
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2018
>
Agreements, Contracts, Proposals
>
Professional Services Agreement - DLZ Indiana LLC - Prep and Assistance with Fat Daddy's Demolition
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2025 9:22:09 AM
Creation date
10/10/2018 3:21:41 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/9/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
d. Final Grading Requirements <br />e. The Owner's preferences regarding recycling of materials <br />f. Requirement regarding to isolate the building that houses Vicki's Bar from <br />the building to be removed. <br />g. Development of Bid Package and/or the Project Phasing requirements. One <br />(1) Bid Package is anticipated as follows: <br />1) Abatement/Demolition Bid Package. <br />c. Field Survey <br />1) Engineer will prepare a topographic survey for the project site based upon the <br />chosen layout from the study report. All survey work for this project shall be <br />performed in accordance with IAC Title 865 regarding Surveys in the State of <br />Indiana. <br />2) Survey notice letters will be sent to property Owners whose property is within or <br />adjoining the survey limits. <br />3) Control - Horizontal control will be based on GPS obtained Indiana East State <br />Plane coordinates, NAD83. Approximately 3 control points will be set around <br />the perimeter of the site. Vertical control will be based on GPS established <br />NAVD88, unless otherwise specified by the client. Two temporary benchmarks <br />will be set outside of the project limits for use by construction. All benchmarks <br />will be thoroughly described and graphically shown on a control map. <br />4) Existing Right -of -Way and Property Lines - The Engineer will verify the <br />existing right-of-way for all streets within the project limits. Subdivision plats, <br />existing road plans, grant, deeds and other recorded documents pertaining to the <br />right-of-way will be obtained from the St. Joseph County Recorder's Office. <br />Field crews will search for existing right-of-way monuments, property irons and <br />block comers; all monuments will be located. Field evidence and recorded <br />documents will be analyzed to establish the existing right-of-way lines. All <br />property lines and property Owner's names will be extracted from GIS data riles <br />provided by the Owner. These lines will be combined with the existing right-of- <br />way established by the Surveyor to create a final property map. <br />5) Full Topographic Mapping — Full topographic mapping within the limits shown <br />in Exhitit A, Figure 1. <br />a. Topographic survey data for both the planimetric map and the existing <br />surface model will be collected for the project area. Shots to be taken for <br />the planimetric map will include, but are not limited to, the following: <br />edge of pavement, curb/gutter, drive entrances, sidewalk, vegetation, <br />landscaping, known storm and sanitary sewer structures and known <br />utilities (both visible on the surface and marked up underground). Shots to <br />be taken for the existing surface model will include cross -sections every <br />Page 3 <br />(Exhibit A — Engineer's Services) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />Copyright D 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.