My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6C (2)
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
01-24-12 Packet
>
6C (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 11:43:44 AM
Creation date
1/20/2012 12:41:35 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South Bend Redevelopment Commission <br />Ignition Park ACM Demolition Proposal — Batch 3 <br />1/09/2012 Page 2 <br />• ALL: We will identify and classify all accessible materials. <br />• ACCESSIBLE. Only materials which are accessible without penetration behind existing walls, <br />floors and ceilings will be sampled; multiple layers on these surfaces will be sampled. <br />• ASSUMED: Suspect ACM enclosed behind existing walls, floors and ceilings will be <br />assumed to be the same material as those portions of the surface or similar surfaces which are <br />accessible. <br />Our scope of services under this Agreement does not include assistance during the design, bid <br />procurement or construction phases of the project. We can provide these services on request for an <br />additional fee once the results of the sampling under this proposal have identified the structures <br />involved. <br />COMPENSATION <br />For providing this Scope of Services, Grauvogel & Associates will be paid on an hourly rate basis, in <br />accordance with the following schedule, plus reimbursable expenses: <br />OR <br />Certified Industrial Hygienist <br />$100.00 <br />IDEM Asbestos Inspector/Planner <br />$100.00 <br />Certified Hazardous Materials Manager <br />$100.00 <br />Reimbursable expenses will consist of laboratory charges and sample shipping/handling charges. <br />Compensation under this Agreement will be allocated as follows: <br />LABOR — Per Structure FEE <br />Asbestos - Containing Materials (ACM) Survey $100.00 <br />ACM Survey Report/IDEM Notification <br />100.00 <br />Subtotal $200.00 <br />RERN IBURSABLES — Per Structure <br />ACM Analyses <br />PLM: 6 per structure @ $15.00 each 90.00 <br />Basic Fee - Per Structure $290.00 <br />ADDITIONAL CHARGES <br />Commercial Buildings (each): Add $100.00 <br />Category I Flooring on concrete (each) <br />Confirming Friable ACM Analysis <br />Analysis by TEM: Add $60.00 <br />The quoted fee for Labor is a fixed amount based on a minimum of 6 structures, independent of the <br />number of suspect asbestos - containing materials encountered and samples. The number of structures <br />
The URL can be used to link to this page
Your browser does not support the video tag.