Laserfiche WebLink
REGULAR MEETING SEPTEMBER 11, 2018 269 <br />OPENING OF BIDS — ONE (1) OR, MORE. USED LOW BOY TRACTOR — SPEC T <br />(STREET DEPARTMENT) <br />This was the date set for receiving and opening of sealed bids for the above referenced project. <br />The Clerk tendered proof of publication of Notice in the South Bend Tribune, which was found <br />to be sufficient. The following bids were opened and publicly read: <br />TRUCK CENTERS, INC. <br />1011 W. Sample St. <br />South Bend, IN 46619 <br />Bid was signed by: Rich Stopczynski <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Bid Bond was not submitted <br />Indiana Local Business Preference Claim Form submitted <br />m <br />Description <br />Year/Make/Model <br />I Unit Price <br />Low Boy Tractor <br />2013 Freightliner Cascadia <br />1 $49,436 <br />Estimated number of days for delivery from award date: 30 days <br />SELKING INTERNATIONAL <br />4849 W. Western Ave. <br />South Bend, IN 46619 <br />Bid was signed by: Kenneth Waite <br />Non -Collusion, Non -Discrimination Affidavit Form was completed <br />Ten percent (10%) Bid Bond was submitted <br />Indiana Local Business Preference Claim Form submitted <br />L: M <br />Description <br />Year/Make/Model <br />I Unit Price <br />Tractor <br />2015 International Model 8600 <br />1 $64,071.00 <br />Estimated number of days for delivery from award date: 30 days <br />Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the above bids <br />were referred to Central Services for review and recommendation. <br />AWARD BID — ST. JOSEPH_STREETSCAPE — PROJECT NO. 118-008 (SSDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on August 28, 2018, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614 in the amount of $423,000. <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD BID — VENUES, PARKS, AND ARTS MAINTENANCE STORAGE BUILDING — <br />PROJECT NO. 118-046R (PARK BOND SERIES I) <br />Mr. Patrick Sherman, Engineering, advised the Board that on August 28, 2018, bids were <br />received and opened for the above referenced project. After reviewing those bids, Mr. Sherman <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />The Robert Henry Corporation, 404 S. Frances St., South Bend, IN 46617, in the amount of <br />$330,174 for the Base Bid plus Alternate Nos. 1, 2, and 3 (Alternate No. 1 = Unit Price $4,421 x <br />3). Therefore, Ms. Maradik made a motion that the recommendation be accepted and the bid be <br />awarded as outlined above. Ms. Fritzberg seconded the motion, which carried. <br />AWARD BID AND APPROVE CONTRACT — LINCOLN WAY EAST CORRIDOR <br />IMPROVEMENTS: SAMPLE STREET TO TWYCKENHAM DRIVE — PROJECT NO 117- <br />055A (PARK BOND/RWDA TIF) <br />Mr. Kyle Silveus, Engineering, advised the Board that on September 6, 2018, bids were received <br />and opened for the above referenced project. After reviewing those bids, Mr. Silveus <br />recommended that the Board award the contract to the lowest responsive and responsible bidder, <br />Walsh & Kelly, Inc., 24358 State Road 23, South Bend, IN 46614, in the amount of $459,000. <br />