Laserfiche WebLink
REGULAR MEETING SEPTEMBER 11, 2018 270 <br />Therefore, Ms. Maradik made a motion that the recommendation be accepted and the bid be <br />awarded and the contract approved as outlined above. Ms. Fritzberg seconded the motion, which <br />carried. <br />AWARD QUOTATION — CHARLES BLACK MONUMENT SIGN (2015 PARK BOND) <br />Mr. Patrick Sherman, Venues, Parks and Arts, advised the Board that on August 28, 2018, <br />quotations were received and opened for the above referenced project. After reviewing those <br />quotations, Mr. Sherman recommended that the Board award the contract to the lowest <br />responsive and responsible bidder, Burkhart Sign Systems, 1247 E. Mishawaka Avenue, South <br />Bend, IN 46615, in the amount of $39,600. Therefore, Ms. Maradik made a motion that the <br />recommendation be accepted and the quotation be awarded as outlined above. Ms. Fritzberg <br />seconded the motion, which carried. <br />APPROVE CHANGE ORDER NO. 5 — DOWNTOWN CROSS STREET IMPROVEMENTS — <br />PROJECT NO. 117-041A PALAIS ROYALE HISTORIC PRESERVATION <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 5 on behalf <br />of Walsh & Kelly, Inc., 24358 SR 23, South Bend, IN 46614, indicating the contract amount be <br />increased by $31,537 for a new contract sum, including this Change Order, in the amount of <br />$1,728,726.22. Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the <br />Change Order was approved. Mr. Gilot noted the funding source on the agenda, RWDA TIF, <br />was incorrect and should be Palais Royale Historic Preservation. <br />APPROVE CHANGE ORDER NO. 1 — TWO-WAY CONVERSION OF COLFAX AVENUE — <br />PROJECT NO. 115-053A (WWDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Rieth-Riley Construction Co., Inc., 25200 State Road 23, South Bend, IN 46614, indicating <br />the contract amount be increased by $6,500 for a new contract sum, including this Change Order, <br />in the amount of $553,203.93. Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg <br />and carried, the Change Order was approved. Mr. Gilot noted the funding source on the agenda, <br />Palais Royale Historic Preservation, was incorrect and should be WWDA TIF. <br />APPROVE CHANGE ORDER NO. 1 — HIBBERD PLAZA IMPROVEMENTS — PROJECT <br />NO. 117-063R (RWDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of R. Yoder Construction, Inc., PO Box 69, Nappanee, IN 46550, indicating the contract amount <br />be increased by $6,798.54 for a new contract sum, including this Change Order, in the amount of <br />$451,874.54. Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and carried, the <br />Change Order was approved. <br />APPROVE CHANGE ORDER NO. 1 — MISHAWAKA AVENUE ROTO ROOTER JETTER <br />REMOVAL —PROJECT NO. 118-069R (SEWER CAPITAL) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 on behalf <br />of Selge Construction Co., Inc., 2833 S. llch Street, Niles, MI 49120, indicating the contract <br />amount be increased by $19,507 for a new contract sum, including this Change Order, in the <br />amount of $72,307. Upon a motion made by Ms. Maradik, seconded by Ms. Fritzberg and <br />carried, the Change Order was approved. <br />APPROVE CHANGE ORDER NO 1 (FINAL) AND PROJECT COMPLETION AFFIDAVIT <br />— FELLOWS STREET RAISED CROSSWALK — PROJECT NO 117 086 (RWDA TIF) <br />Mr. Gilot advised that Mr. Toy Villa, Engineering, has submitted Change Order No. 1 (Final) on <br />behalf of Rieth-Riley Construction Co., Inc. 25200 State Road 23, South Bend, IN 46614, <br />indicating the contract amount be increased by $2,346.12 for a new contract sum, including this <br />Change Order, of $106,438.62. Additionally submitted was the Project Completion Affidavit <br />indicating this new final cost of $106,438.62. Upon a motion made by Ms. Maradik, seconded <br />by Ms. Fritzberg and carried, Change Order No. 1 (Final) and the Project Completion Affidavit <br />were approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS AND TITLE <br />SHEET — GEMINI WASHINGTON-COLFAX MASONRY AND STAIR REPAIRS <br />PROJECT NO. 118-080B (WWDA TIF) <br />In a memorandum to the Board, Mr. Kyle Silveus, Engineering, requested permission to <br />advertise for the receipt of bids for the above referenced project. Mr. Gilot noted a Title Sheet <br />