r� <br />LASALLE SQUARE, PHASE 1 <br />IMPROVEMENTS TO NORTH /SOUTH STREET ADJACENT TO LIBRARY <br />340 feet of New R/W and Street consisting of 24 feet of asphalt milling and overlay, and new 64nch curb on east side <br />Preliminary Cost Estimate <br />Revised June 7, 2011 <br />REM NO. <br />DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNITS <br />UNIT PRICE <br />ESTIMATED <br />COST <br />1 <br />Mobilization / Demobilization <br />1 <br />LSUM <br />5% <br />$4,700 <br />2 <br />Construction Engineering <br />1 <br />LSUM <br />1.5% <br />$1,400 <br />3 <br />Material Testing <br />1 <br />LSUM <br />0.5% <br />$500 <br />4 <br />Maintenance of Traffic <br />1 <br />LSUM <br />0.5% <br />$500 <br />5 <br />Clearing <br />1 <br />LSUM <br />$1,000 <br />$1,000 <br />6 <br />Temporary Erosion and Sediment Control <br />1 <br />LSUM <br />$1,000 <br />$1,000 <br />7 <br />Earthwork <br />1 <br />LSUM <br />$5,000 <br />$5,000 <br />8 <br />Pavement and Curb, Remove <br />260 <br />SYS <br />$10 <br />$2,600 <br />9 <br />Miscellaneous Removals <br />1 <br />LSUM <br />$2,500 <br />$2,500 <br />10 <br />Pavement Milling, 1" <br />1,280 <br />SYS <br />$10 <br />$12,800 <br />11 <br />Compacted Aggregate Base, 6" (adj. to new curb) <br />35 <br />TON <br />$17 <br />$595 <br />12 <br />HMA Surface, 1 1/2" <br />110 <br />TON <br />$70 <br />$7,700 <br />13 <br />HMA Base, 3 1/2" (adj. to new curb) <br />20 <br />TON <br />$60 <br />$1,200 <br />14 <br />Standard Concrete Curb <br />400 <br />LFT <br />$15 <br />$6,000 <br />15 <br />Concrete Sidewalk, 4" <br />10 <br />SYS <br />$35 <br />$350 <br />16 <br />Concrete Curb Ramp <br />10 <br />SYS <br />$125 <br />$1,250 <br />17 <br />Drive Approaches <br />1 <br />EA <br />$4,000 <br />$4,000 <br />18 <br />Seeding /Restoration <br />1 <br />LSUM <br />$1,500 <br />$1,500 <br />19 <br />Storm Sewer Structure <br />2 <br />EA <br />$2,000 <br />$4,000 <br />20 <br />Storm Sewer Pipe <br />90 <br />LFT <br />$30 <br />$2,700 <br />21 <br />Sanitary Sewer Manhole <br />5 <br />EA <br />$2,500 <br />$12,500 <br />22 <br />Sanitary Sewer, 12" <br />600 <br />LFT <br />$40 <br />$24,000 <br />23 <br />Pavement Markings and Signage <br />1 <br />LSUM <br />$500 <br />$500 <br />SUBTOTAL: <br />$98,295 <br />Contingency, 10% <br />$9,900 <br />Engineering and Surveying (Estimated) <br />$20,000 <br />ESTIMATED COST: <br />$128,195 <br />FUTURE WORK <br />1 <br />Conduit for Lighting <br />300 <br />LFT <br />$7 <br />$2,100 <br />2 <br />Light Pole and Foundation <br />2 <br />EA <br />$7,500 <br />$15,000 <br />3 <br />Conduit for Metronet, 2" <br />300 <br />EA <br />$12 <br />$3,600 <br />4 <br />Handhole <br />2 <br />EA <br />$800 <br />$1,600 <br />ESTIMATED COST OF FUTURE WORK: <br />$22,300 <br />ABONMARCHE CONSULTANTS, INC. <br />an 750 Lincoln Way East <br />NOMWAKK South Bend, IN 46601 <br />'h <br />F: \Projects \11-0203 \[Preliminary Estimates 06-07 -11 A]Phase 1 - Street Adj to Library <br />