Laserfiche WebLink
Preliminary Cost Estimate <br />Revised June 7, 2011 <br />ITEMNO. <br />DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />LASALLE SQUARE, PHASE 1 <br />UNIT PRICE <br />IMPROVEMENTS TO EAST /WEST STREET (FUTURE BONDS AVENUE EXTENSION) <br />1 <br />490 feet of New R/W and Street consisting of 24 feet of asphalt, 6 -inch curb on each side, and sidewalk on north side <br />1 <br />(Estimate does not include demolition of previous restaurant site( <br />Preliminary Cost Estimate <br />Revised June 7, 2011 <br />ITEMNO. <br />DESCRIPTION <br />ESTIMATED <br />QUANTITY <br />UNITS <br />UNIT PRICE <br />ESTIMATED <br />COST <br />1 <br />Mobilization / Demobilization <br />1 <br />LSUM <br />5% <br />$8,600 <br />2 <br />Construction Engineering <br />1 <br />LSUM <br />1.57. <br />$2,600 <br />3 <br />Material Testing <br />1 <br />LSUM <br />0.5% <br />$900 <br />4 <br />Maintenance of Traffic <br />1 <br />LSUM <br />0.5% <br />$900 <br />5 <br />Clearing <br />1 <br />LSUM <br />$1,500 <br />$1,500 <br />6 <br />Temporary Erosion and Sediment Control <br />1 <br />LSUM <br />$2,000 <br />$2,000 <br />7 <br />Earthwork <br />1 <br />LSUM <br />$7,500 <br />$7,500 <br />8 <br />Earthwork - Shallow Depressions <br />1 <br />LSUM <br />$3,000 <br />$3,000 <br />9 <br />Pavement and Curb, Remove <br />2,800 <br />SYS <br />$6 <br />$16,800 <br />10 <br />Miscellaneous Removals <br />1 <br />LSUM <br />$2,500 <br />$2,500 <br />11 <br />Compacted Aggregate Base, 6" <br />580 <br />TON <br />$17 <br />$9,860 <br />12 <br />HMA Surface, 1 1/2" <br />145 <br />TON <br />$70 <br />$10,150 <br />13 <br />HMA Base, 3 1/2" <br />340 <br />TON <br />$60 <br />$20,400 <br />14 <br />Standard Concrete Curb <br />820 <br />LFT <br />$15 <br />$12,300 <br />15 <br />Concrete Sidewalk, 4" <br />230 <br />SYS <br />$35 <br />$8,050 <br />16 <br />Concrete Curb Ramp <br />25 <br />SYS <br />$100 <br />$2,500 <br />17 <br />Drive Approaches <br />3 <br />EA <br />$4,000 <br />$12,000 <br />18 <br />Seeding/Restoration <br />1 <br />LSUM <br />$2,000 <br />$2,000 <br />19 <br />Landscape Restoration / Stone <br />1 <br />LSUM <br />$5,000 <br />$5,000 <br />20 <br />Storm Sewer Structure <br />6 <br />EA <br />$2,000 <br />$12,000 <br />21 <br />Storm Sewer Pipe <br />140 <br />LFT <br />$30 <br />$4,200 <br />22 <br />Subsurface Drainage (Perforated Pipe with Stone Bedding) <br />200 <br />LFT <br />$60 <br />$12,000 <br />23 <br />Fire Hydrant Assembly <br />2 <br />EA <br />$2,000 <br />$4,000 <br />24 <br />Fire Hydrant Assembly, Reconnect <br />1 <br />EA <br />$500 <br />$500 <br />25 <br />Water Main, 8" <br />500 <br />LFT <br />$35 <br />$17,500 <br />26 <br />Pavement Markings and Signa e <br />1 <br />LSUM <br />$500 <br />$500 <br />SUBTOTAL: <br />$179,260 <br />Contingency, 10% <br />$18,000 <br />Engineering and Surveying (Estimated) <br />$25,000 <br />ESTIMATED COST: <br />$222,260 <br />ALTERNATE <br />1 Save Existing Curb on South Side 180 1 LET $20 $3,600 <br />FUTURE WORK <br />1 <br />Sidewalk, 4 ", south side <br />260 <br />SYS <br />$35 <br />$9,100 <br />2 <br />Conduit for Lighting <br />500 <br />LFT <br />$7 <br />$3,500 <br />3 <br />Light Pole and Foundation <br />2 <br />EA <br />$7,500 <br />$15,000 <br />4 <br />Conduit for Metronet, 2" <br />500 <br />EA <br />$12 <br />$6,000 <br />5 <br />Handhole <br />2 <br />EA <br />$800 <br />$1,600 <br />ESTIMATED COST OF FUTURE WORK: $35,200 <br />anABONMARCHE CONSULTANTS, INC. <br />750 Lincoln way East <br />aiii" R South Bend, 11146601 <br />F: \Prolecis\ I 1 -0703 \iPreliminary Btlmotes 06L7 -1 I �dslPhose 1 -Bonds <br />