Laserfiche WebLink
If the exact number of circuits or horsepower is unknown at the time of the application <br />for a permit, a permit may be taken for the minimum amount known with new permits issued as <br />the extent of the work is known. <br />Section VI. Chapter 6, Article 1, Section 6 -25(a) of the South Bend Municipal Code be <br />and hereby is amended to read as follows: <br />(a) All electrical wiring and equipment installations and alterations requiring a permit <br />shall be inspected by the Electrical Inspector. The permit holder shall notify the Electrical <br />Inspector at least twenty -four (24) hours in advance of the time the work is ready for inspection. <br />If the work does not pass inspection, a reinspection fee of *wen4y five dell fs x$25 nn` thirty <br />dollars ($30.00) shall be charged for each future, inspection of that stage of work. <br />Section VII, Chapter 6, Article 1, Section 6- 36.3(c) of the South Bend Municipal Code <br />be and hereby is amended to read as follows: <br />(c) Fees. Each application for a permit for installation of heating, ventilating, air <br />conditioning, and refrigeration equipment or systems shall be accompanied by fees in accordance <br />with the schedule below, with a minimum permit fee being twenty ae"°Ns ($20.00) thirty dollars <br />$30.00. When the total capacity of any system in any single installation is provided by more <br />than one (1) unit, the sum of the capacities of each unit and the total number of such units shall <br />determine the fee. <br />Space heaters, each 30,000 Btu input or more ......... ............................... 20.00 <br />30.00 <br />Warm -air furnaces, unit heaters, cabinet heaters, and radiant tube heaters: <br />a. Up to 300,000 Btu ...................... ............................... 20.00 <br />30.00 <br />b. 300,000 Btu input or more ............................ ............................... 30.00 <br />40.00 <br />Oil and gas conversions: <br />L. Up to 300,000 Btu input ................. ............................... 200 <br />30.00 <br />b. 300,000 Btu input or more ............................. ............................... 30.00 <br />40.00 <br />Electric furnaces (air handling): <br />a. Less than 100 kw input ................... ............................... 20.00 <br />30.00 <br />b. 100 kw input or more ..................................... ............................... 30.00 <br />40.00 <br />Air Conditioning: <br />a. Central, electric: <br />1. Less than 5 tons ...................... ............................... 20.00 <br />30.00 <br />2. 5 to 10 tons ........................ ............................... ..........................30:00 <br />40.00 <br />3. Over 10 tons ..................... ............................... ...........................50.00 <br />60.00 <br />b. Water chillers ......................... ............................... ..........................75.00 <br />85.00 <br />c. EMI -air blower ...................... ............................... ...........................20.00 <br />30.00 <br />Ventilating and exhaust systems: <br />a. Less than 500 CFM capacity ..................... ....:....................... <br />6.00 <br />b. 500 to 1,500 CFM capacity ........................ ..........................10.00 <br />12.00 <br />(Plus 1.00 for each 500 CFM or fraction thereof in excess of 1,500 CFM) <br />Ventilating commercial hoods including make up air: <br />a. 500 CFM to 1,500 CFM capacity ............... ..........................30.00 <br />60.00 <br />