Laserfiche WebLink
b. Over 1,500 CFM capacity ................... ............................... 60.00 120.00 <br />Refrigeration and engine- driven, gas -fired or oil -fired cooling equipment: <br />a. 1 to 5 horsepower, each .............................. ..........................15.00 17.00 <br />b. 6 to 10 horsepower, each ............................ ..........................25.00 30.00 <br />c. More than 10 horsepower, each .................. ..........................40.00 45.00 <br />Rooftop combination furnace and air conditioning units, 60,000 to 300,000 Btu's, <br />each: <br />a. Up to 7 %2 tons ........ <br />b. 7 1/2 tons or more.... <br />10 Heat pumps: <br />Gas reconnection, each ........................................ ............................... 20.00 30.00 <br />Gas piping (distribution of piping to equipment) to be included on permit <br />application <br />Each gas piping system, per outlet ........... ............................... 1-003.00 <br />(18) Woodburning stoves, per flue (including chimney and chimney <br />connector) ...................................... ............................... 20.00 30.00 <br />(19) Each reinspection fee ................... ............................... ..........................25.00 30.00 <br />(20) Each additional final inspection .. ............................... ...........................58.00 60.00 <br />10 <br />a. 1,000 to 60,000 Btu's input ..... ............................... 20.00 <br />30.00 <br />b. 60,000 to 300,000 Btu's: <br />1. Up to 7V2 tons, each ....................... ..........................40.00 <br />45.00 <br />2. 71/2 tons or more, each ..................... .........................7 -5.00 <br />85.00 <br />c. Earth, coupled water source .......................... .........................50.00 <br />60.00 <br />11 <br />Boilers, steam or hot water: <br />a. Up to 300,000 Btu' s .............. ............................... 20.00 <br />30.00 <br />b. 300,000 Btu's or more ............................... ...........................50.00 <br />60.00 <br />12 <br />Through -wall combination air conditioning/heating and VAV boxes w /coil: <br />a. First unit ....................... ............................... ..........................20.00 <br />30.00 <br />b. Each additional unit ..... ............................... ..........................10.00 <br />12.00 <br />c. Solar heat units ...................................... ............................... 50.00 <br />60.00 <br />(13) <br />Air handlers <br />a. 400 CFM to 2,500 CFM .............................. ..........................25.00 <br />30.00 <br />b. Over 2,500 CFM ........... ............................... ..........................60.00 <br />70.00 <br />(14) <br />Back -up generators -gas line: <br />a. 10 Kv or less.. <br />30.00 <br />b. Over 10 Kv.... ............. ............................... <br />50.00 <br />15 <br />Duct and register: <br />a. First 15 openings, per system.. <br />30.00 <br />b. Each oyeniniz thereafter, per system ................................. <br />1.00 <br />Gas reconnection, each ........................................ ............................... 20.00 30.00 <br />Gas piping (distribution of piping to equipment) to be included on permit <br />application <br />Each gas piping system, per outlet ........... ............................... 1-003.00 <br />(18) Woodburning stoves, per flue (including chimney and chimney <br />connector) ...................................... ............................... 20.00 30.00 <br />(19) Each reinspection fee ................... ............................... ..........................25.00 30.00 <br />(20) Each additional final inspection .. ............................... ...........................58.00 60.00 <br />10 <br />